Thosaigh OPW an Scéim Mionoibreacha um Maolú Tuile agus Cosaint Chósta in 2009. Is aidhm don scéim maoiniú a sholáthar chuig Údaráis Áitiúla, chun mionoibreacha um maolú tuile a thionscnamh nó staidéir a dhéanamh chun aghaidh a thabhairt ar fhadhbanna tuile agus cosaint chósta laistigh dá gceantair riaracháin féin. De ghnáth, tá feidhm leis an scéim sa chás gur féidir réiteach a aimsiú agus a fheidhmiú laistigh de ghearrthréimhse ama.
Faoin scéim, breathnaítear iarratais ar thionscadail a mheastar ar chostas nach mó ná €750,000 i ngach cás. Tá maoiniú suas chuig 90% den chostas ar fáil le haghaidh tionscadail faofa. Measann OPW iarratais maidir le critéir ar leith na scéime – eacnamaíoch, sóisialta agus comhshaoil, coibhneas costais is tairbhe san áireamh.
De ghnáth, ní bhreathnófar um maoiniú OPW oibreacha is cúram de na húdaráis áitiúla. Ach sa chás go maolódh a leithéid d’oibreacha priacal tuile réadmhaoine, féadfaidh OPW maoiniú i bpáirt a bhreathnú. Ní mór do na hÚdaráis Áitiúla a bheith sásta nach mbeidh tionchar ag na hoibreacha ar phriacal tuile in áit eile. Is ceist do gach Údarás Áitiúil féin oibreacha um a bhfuil maoiniú faofa a thosú agus a chur chun cinn.
Léirítear sa tábla thíos liosta de na tionscadail mionoibreacha um a bhfuil maoiniú faofa. Féadfar Bileoga Eolais agus Foirmeacha Iarratais maidir leis an Scéim Mionoibreacha a fháil ar gov.ie
Nuashonraithe: 01/07/2025
Údaráis Áitiúil | Láthair an Tionscadail | Sonraí an Tionscadail | Maoiniú Faofa | An Bhliain inar Faomhadh |
---|---|---|---|---|
Wexford County Council | Clone Road Clone Upper | Coastal protection works | 90,000 | 2009 |
Wexford County Council | Ballyhack | Coastal flood defence works, comprising raised sea walls, demountable barriers at opening in sea walls & foul pumping station. (excludes works to provide new combined sewer) | 301,500 | 2016 |
Wexford County Council | Seaview, Bastardstown, Co. Wexford | Works to section 3, the last 145m to protect houses to the east of the coastline, consisting of full height Rock Armour. Section 3a. 100m of coastline. | 657,338 | 2024 |
Wexford County Council | Seaview Kilmore | Detailed Design Study | 36,000 | 2021 |
Wexford County Council | Rosslare Warren Middle | Coastal erosion risk management study | 28,800 | 2015 |
Wexford County Council | Gorey | Bridge improvements, channel cleaning & regrading | 450,000 | 2010 |
Wexford County Council | Seaview Kilmore Bastardstown | Wexford County Council propose to implement 155m of rock armour coastal protection fronting several houses at Seaview (Bastardstown) on the Wexford Coast. Emergency works were undertaken to the initial 100m of coastline (section 01). WCC intend to implement an additional layer of rock armour in order to bring emergency works up to long term standard. WCC will then add additional full rock armour to the second section (section 02) for next 55m of coastline. The proposed works in this application directly protect some 10 of these houses and some 155m the access road. | 668,921 | 2024 |
Wexford County Council | Old Town Lane Castlebridge | Replacement of existing 600mm diameter pipes with 1200mm pipes, terminating in a pumping chamber under the roadway. | 61,200 | 2010 |
Wexford County Council | Donaghmore Graveyard | Coastal flood defence works, comprising the placing of rock armour at the base of the cliff & the removal of three damaged structures from the top of the cliff | 254,078 | 2016 |
Wexford County Council | Growtown Upper, Taghmon, Barntown, | Remove the existing wall in front of the house, construct new solid block wall removing the pedestrian and vehicle access from the front of the property. Provide new pedestrian access from the local road above flood line of the house. Provide sump pump location at low point in yard to allow surface water to be removed from behind the wall. Divert surface water at the back of the house away from the front of the house | 30,742 | 2024 |
Wexford County Council | Wexford Racecourse | Flood alleviation scheme- enlarge an existing irrigation pond & construct an embankment to impound the flood water and restrict the discharge to a lower volume in keeping with the estimated capacity of the network | 99,000 | 2019 |
Wexford County Council | Wexford Racecourse | Flood alleviation scheme- enlarge an existing irrigation pond & construct an embankment to impound the flood water and restrict the discharge to a lower volume in keeping with the estimated capacity of the network | 126,000 | 2018 |
Wexford County Council | Rosslare Spit West Side | The construction of an earthen embankment and sections of demountable wall. Total length 1,075 metres | 551,377 | 2020 |
Wexford County Council | Seaview, Bastardstown, Co. Wexford | Works to section 3, the last 145m to protect houses to the east of the coastline, consisting of full height Rock Armour ; Section 3b. The last 45m of coastline to the east. | 295,802 | 2024 |
Wexford County Council | Bridgetown (IPP) | Provide demountable flood gates and barriers on affected properties. | 157,770 | 2022 |
Wexford County Council | Seaview, Kilmore | Rock armour cliff toe protection over approx 70 to 85m of cliff frontage immediately adjacent to access road to 14 properties at immediate risk of erosion | 367,740 | 2021 |
Wexford County Council | Wexford Harbour | Several short critical sections of the existing erosion/flood defences around Wexford Harbour to be strengthened and raised in order to avoid/mitigate future flooding | 90,000 | 2011 |
Wexford County Council | Bridgemeadows, Lyre River, Enniscorthy | Repair / replacement of sluice gate & associated works | 34,392 | 2021 |
Wexford County Council | Badgers Hill | Remove the access to the property and continue the bund/ditch already around the property passed the lowest point. Create a new entrance on the higher section of the road to prevent risk of flooding. | 25,869 | 2024 |
Wexford County Council | Bridgetown | Complete a feasibility study on the impact of flood, mitigation and prevention options, including modelling of the options. | 70,200 | 2022 |
Wexford County Council | Clone Road Phase 2 | Works | 112,500 | 2010 |
Wexford County Council | Irish National Heritage Park, Co. Wexford | Seal the gully in the south-eastern corner of the carpark with a sealed manhole cover. Relocate the other two gullies circa 2-3m for the current locations install interconnecting pipe work from the new gully pots. Fit a non-return valve on the pipes in independent chambers and using the existing pipe connections to the culvert. Install a duckbill tide flex valve Break out footpath and cut back drainpipe in the north-eastern corner and back fill with concrete. Raise the level of the splitter chamber above the level of the adjacent footpath. | 27,000 | 2024 |
Wexford County Council | Arthurstown | Coastal flood defence works, comprising raised sea walls, demountable barriers & foul and surface water pumpimg stations | 414,000 | 2016 |
Wexford County Council | St. Kiernan Bannow Bay | St. Kiernan's Coastal Protection Consultancy Study | 18,000 | 2010 |