English

Bainistiú Priacal Tuile – Achoimre Contae

Cuimsíonn an Tuarascáil Achoimreach Contae ar Bhainistiú Priacal Tuile eolas faoi na réimsí seo a leanas;

  • Mórscéimeanna um Fhaoiseamh Tuile
  • Eolas maidir le “Mionscéimeanna” PBPT faoi threoir na n-Údarás Aitiúil
  • Scéim Mionoibreacha um Maolú Tuile agus Cosaint Chósta
  • Cothabháil déanta faoin Acht um Dhraenáil Artaireach 1945
  • Forbhreathnú ar na Pleananna um Bainistiú Priacal Tuile 2018

Roghnaigh contae chun an t-eolas atá uait a fheiceáil/íoslódáil .

Tipperary Achoimre Contae

Mórscéimeanna um Fhaoiseamh Tuile

Go stairiúil, bhí bainistiú priacal tuile dírithe ar dhraenáil artaireach um fheabhsú talmhaíochta. Mar gheall ar an méadú ar phriacal tuile, in 1995 leasaíodh an tAcht um Dhraenáil Artaireach 1945; thug an leasú seo cead d’Oifig na nOibreacha Poiblí (OPW) scéimeanna áitiúla um fhaoiseamh tuile a fheidhmiú, chun cosaint ó thuilte a chur ar fáil i gcathracha, bailte móra agus sráidbhailte.

Tá roinnt scéimeanna curtha i gcrích ag na hÚdaráis Áitiúla, ag baint feidhm as a gcumhachtaí féin faoin reachtaíocht Pleanála agus Forbartha. Oibríonn OPW i gcomhpháirt leis na hÚdaráis Áitiúla cuí nó maoinítear na hÚdaráis Áitiúla go díreach chun oibreacha um fhaoiseamh tuile a dhéanamh.

Scheme Properties Protected Current Status
Carrick-on-Suir Flood Relief Scheme 110 Scheme Completed 2003
Clonmel (North & East) Flood Relief Scheme 358 Scheme Completed 2013
Mulkear River (Ballymackeogh) Flood Relief Scheme 53 Scheme Completed 1998
Clonmel (West) Flood Relief Scheme 142 Scheme Completed 2012
Marlfield Lake Flood Relief Scheme 11 Stage I: Scheme Development and Preliminary Design
River Mall (Templemore) Flood Relief Scheme 109 Stage IV: Implementation/Construction
Nenagh Flood Relief Scheme 60 Under Consideration
*This information has been extracted from the 2018 Flood Risk Management Plans as more up to date information is not currently available.

“Mionoibreacha” BPT

Eolas maidir le “Mionoibreacha” BPT faoi threoir na n-Údarás Áitiúil (tionscadal ar bith a chosnaíonn suas chuig €1M nó a thugann cosaint ar 10 réadmhaoin nó níos mó)

Scheme Stage/Gateway Properties Protected
Holycross Flood Relief Scheme Commencement 2
Golden Flood Relief Scheme 5
Knocklofty Flood Relief Scheme Commencement 5
*This information has been extracted from the 2018 Flood Risk Management Plans as more up to date information is not currently available.

Scéim Mionoibreacha um Maolú Tuile agus Cosaint Chósta

Thosaigh OPW an Scéim Mionoibreacha um Maolú Tuile agus Cosaint Chósta in 2009. Is aidhm don scéim maoiniú a sholáthar chuig Údaráis Áitiúla, chun mionoibreacha um maolú tuile a thionscnamh nó staidéir a dhéanamh chun aghaidh a thabhairt ar fhadhbanna tuile agus cosaint chósta laistigh dá gceantair riaracháin féin. De ghnáth, tá feidhm leis an scéim sa chás gur féidir réiteach a aimsiú agus a fheidhmiú laistigh de ghearrthréimhse ama.

Faoin scéim, breathnaítear iarratais ar thionscadail a mheastar ar chostas nach mó ná €750,000 i ngach cás. Tá maoiniú suas chuig 90% den chostas ar fáil le haghaidh tionscadail faofa. Is ceist do gach Údarás Áitiúil féin oibreacha um a bhfuil maoiniú faofa a thosú agus a chur chun cinn.

Local Authority Project Location Project Details Approved Funding (€) Year of Approval
Tipperary County Council Baynanagh Toomevara Remove wall, lay piping, construct inspection chambers and roadside gullies. Provide fencing. 42,210 2010
Tipperary County Council Lagganstown Road drainage system & outfall pipe through hill to natural lake 18,000 2015
Tipperary County Council Graigue Clogheen To intercept storm water, works to include the laying of a 450mm diameter corripipe, backfilling & road reinstatement works 13,950 2017
Tipperary County Council Ardfinnan Clonmel Works – Strengthening riverbank, raising embankment & removal of vegetation. 15,636 2010
Tipperary County Council Carrigeen Cahir Improvements to Marshes Stream 26,325 2010
Tipperary County Council Holycross, Thurles Construct a new surface water storm drain 315m long including manholes and chambers and civils works, outfall to existing open drain. 77,400 2022
Tipperary County Council St. Johnstown Fethard Replacement of culvert 4,500 2012
Tipperary County Council Holy Cottage Road, Barnane, Templemore Construction of 520m of a 450mm surface water pipe along with a number of new gullies & associated works. 1,241 2021
Tipperary County Council Tivoli Heights Clonmel Works-Installation of new grill to improve flow, constructionof wing walls to side of culvert/pipe 18,000 2009
Tipperary County Council Kilroe, Ballylooby Excavation of approx. 250 metres of a new 1.50m deep drainage ditch 14,200 2012
Tipperary County Council Buffanagh Killenaule Maintenance of river between Buffanagh & Moglass 13,250 2012
Tipperary County Council Marlfield Lake Clonmel Site Investigation, including culvert systems and design of repair and reconstruction works 12,600 2010
Tipperary County Council Toureen Cahir Installation of 450mm pipe and 350m of additional land drains 11,250 2010
Tipperary County Council Currabaha Construct inspection chambers, upgrade existing land drainage pipe. 9,900 2010
Tipperary County Council Blackcastle Road Templemore To install a new 6m culvert beside the existing bridge, river widening & associated works. 98,100 2021
Tipperary County Council R-690-4 Lismalin Install new drainage culvert beneath the R69-4 & excavate a new 130m long open drainage ditch on private lands 10,800 2016
Tipperary County Council Barna Newport Provide 12” diameter piping at roadside for 250 metres to discharge to soak-pits 27,180 2012
Tipperary County Council Spa Villa Old Spa Road Clonmel Form temporary dam & concrete bed, provide additional protection to wall, construct clay embankment & associated works 5,400 2014
Tipperary County Council Newcastle Clonmel To replace sections of the existing masonry walls & replace with railing or other approved construction, to reduce risk of flooding of commercial premises using flood walls, gates etc. & fit non-return valves to existing pipe network 21,600 2016
Tipperary County Council Ballylooby Construct reinforced earth embankment/Masonry wall along river bank within affected property. Install non - return valves on storm pipes draining to river. Install temporary Flood barriers at strategic locations to the affected property. 25,200 2024
Tipperary County Council Nenagh Swimming Pool & Adjacent Land Clean drains/stream of silt/debris/vegetation Upgrade embankments 13,500 2012
Tipperary County Council Ballinahalla Clogheen To install drainage gullies & lay approximately 800m of 300mm diameter storm water drainage pipe to outfall 45,000 2016
Tipperary County Council Greenan Templederry Removal of existing boundary wall at the affected property including the sections collapsed. Excavation of silt deposits under bridge arch no. 1 to increase the headroom. Importation and compaction of 6-12" rock to restored river bed. Deposition/relocation of existing river bed material. Placing of Rock Armour and creation of earth retaining bund. Placing of Suitable fill material behind rock armour. 31,613 2024
Tipperary County Council Knockballiniry Goatenbridge Excavation works, the laying of 450mm diameter corripipe, two road crossings & associated works 32,625 2017
Tipperary County Council Grange Village Clonmel Survey and study 6,300 2011
Tipperary County Council Barravie Construct gullies and lay piping, upgrade existing pipe, clean out existing land drain 18,054 2010
Tipperary County Council Red City Fethard Upgrade culvert 52,920 2010
Tipperary County Council Grange Road Ballina To provide 12 inch diameter SW piping and associated road gullies for a total distance of 400m 47,610 2011
Tipperary County Council Mullinahone Removal of debris from the channel and banks prior to building a foundation and retaining wall along the banks A design and method statement to be developed 225,000 2017
Tipperary County Council Ardfinnan Clonmel Works – Strengthening riverbank, raising embankment & removal of vegetation. 162,684 2009
Tipperary County Council Moangarriff Clonmel Channel improvements 30,600 2010
Tipperary County Council Ardfinnan Clonmel Works – Strengthening riverbank, raising embankment & removal of vegetation. 44,550 2010
Tipperary County Council Gortnahoola, Drombane, Thurles - Revised Construct a new 750mm surface water storm line 155 metres along public road 29,700 2023
Tipperary County Council Marlfield Clonmel Tipperary County Council propose to install temporary works to support the large retaining wall and parapet, if deemed necessary; Remove all vegetation and trees within the vicinity of the culvert. TTC propose to partly remove and strengthen the existing stone masonry and concrete retaining walls to the upstream embankments. 45,000 2024
Tipperary County Council Ardfinnan Clonmel Installation of 40 linear metres by approx 3 metres height of rock armour to provide 1.2 metres height of protection to existing river bank 15,480 2010
Tipperary County Council Ardfinnan Replace old Barriers with a modern reliable new system that is fit for purpose 27,000 2024
Tipperary County Council Cloughcarrigeen Estate Kilsheelin To install new 240m long 300mm diameter surface water drainage pipe, connect existing open channel linear attenuation drain to new estate surface water drainage system & clean existing open drain 63,000 2016
Tipperary County Council Cascade Height Clonmel Provide side support to the existing banks of Aulk Stream and reinforced concrete wall to front / Purchase concrete blocks and amend grille / Clean culvert under the road 14,805 2010
Tipperary County Council R504 at Longhouse Birdhill Install 4no new gullies & lay 100m of 300mm diameter drainage pipes to an outfall 13,500 2015
Tipperary County Council Coolaholiga Nenagh Channel maintenance, replace culvert. Restore parapet walls and wing walls 24,000 2010
Tipperary County Council Drish Thurles Construction of a 450mm surface water pipe for a distance of 250m to an open drain along with a number of new road gullies & associated works. 18,900 2019
Tipperary County Council Clonsingle Newport Construct new flood ramp, 2 new piers & barrier foundation. Purchase of flood barrier & fixtures 13,500 2016
Tipperary County Council River Suir Loughmore Removal of obstructions & improvement of Water Conveyance in part of the River Channel which is not a Drainage District 45,000 2015
Tipperary County Council Ballinderry Install new stone filter drain with perforated 225mm storm pipe & large gully 47,700 2016
Tipperary County Council Coopers lot, Cashel, Thurles, South Tipperary Geomorphological analysis, Hydrological modelling and modelling assessment. 22,500 2023
Tipperary County Council Galbertstown Holycross Construct a new surface water storm drain 400m long including manholes and chambers and civils works, outfall to existing open drain. 76,500 2021
Tipperary County Council Coopers lot, Cashel, Thurles, South Tipperary Geomorphological analysis, Hydrological modelling and modelling assessment. 45,000 2022
Tipperary County Council Coopers lot, Cashel, Thurles, South Tipperary Ground Investigation Surveys and SI 107,100 2023
Tipperary County Council Doon Araglin Excavation of a new drainage ditch, cleaning an existing deep drainage ditch, installation of drainage pipes and electric fencing 14,580 2011
Tipperary County Council Clareen Cross Moyaliff Ballycahill To construct approx. 600m of 300mm diameter pipe line and associated accommodation works 33,408 2011
Tipperary County Council Ballinderry, Nenagh Install new stone filter drain with perforated 225mm storm pipe and long gully & discharge via 300mm storm pipe. Total length 455m 72,292 2018
Tipperary County Council Tivoli Heights Clonmel Works-Installation of new grill to improve flow, constructionof wing walls to side of culvert/pipe 1,373 2010
Tipperary County Council Railstown Cashel Widen Moyle Stream, repair bridges & culverts 45,360 2010
Tipperary County Council Capparoe, Nenagh Supply & lay 80m of 300mm/120mm/300 diameter/120mm 450mm diameter pipeline Associated works 43,042 2020
Tipperary County Council Nenagh Road Borrisoleigh Construction of 120m of a 450mm surface water pipe along with 3 new gullies & associated works 27,000 2019
Tipperary County Council Mullinahone Removal of debris from the channel and banks prior to building a foundation and retaining wall along the banks A design & method statement to be developed 119,700 2020
Tipperary County Council R-691- 4 Ballinure School Clear out 500m of open drain on agricultural land & dispose of material 13,500 2016
Tipperary County Council Ardfinnan Clonmel The provision of a pumping installation in the 'Back River' to discharge to River Suir over flood defences during flood times 15,750 2011
Tipperary County Council Gortnahoe Construct a new surface water storm drain 200 metres long including manholes and chambers and civils works, outfall to existing open channel. 22,500 2023
Tipperary County Council Greenhills/Kilmastulla Ballina Upgrade of the existing road surface water drainage system & associated works 56,700 2018
Tipperary County Council Convent Road Cahir Cleaning & deepening of existing drain / Excavation of trench / Laying of pipe bedding and 40m of concrete pipe / Construct manhole and backfill/compact / Restoration works 31,500 2010
Tipperary County Council Rathkennan Overflow pipe from lane way adjacent to houses to mitigate against flooding 4,500 2015
Tipperary County Council Dualla Road and Waller’s Lot Cashel Town (Revised) Study 4,389 2018
Tipperary County Council The Millrace Cahir Clean & dredge the Milrace from the River Suir to the downstream weir, remove silt & vegetation 35,550 2017
Tipperary County Council Dualla Road and Waller’s Lot Cashel Town Study 22,611 2017
Tipperary County Council Curragh Goatenbridge Cleaning of approx 200 metres of existing 1.50m deep drainage ditch /Installation of approx. 60 metres of 375mm concrete drainage pipe & drainage grates 7,650 2012
Tipperary County Council Grange Cremary Install 900mm pipes to upgrade bridge capacity 9,000 2012
Tipperary County Council Blackcastle Rd, Templemore, Co. Tipperary Tipperary County Council propose to construct an additional 6m culvert beside an existing bridge. TCC then intend on raising the road as well as widening an existing channel. 181,000 2024
Tipperary County Council Holy Cottage Road, Barnane, Templemore Construction of 520m of a 450mm surface water pipe along with a number of new gullies & associated works 13,500 2019

Cothabháil déanta faoin Acht um Dhraenáil Artaireach 1945

Tá freagracht reachtúil ar OPW clár cothabhála um Dhraenáil Artaireach a reachtáil agus déantar é sin. Baineann na hoibreacha cothabhála seo le scéimeanna um dhraenáil artaireach críochnaithe ag OPW faoin Acht um Dhraenáil Artaireach 1945; bá é feabhsú talmhaíochta príomaidhm na scéimeanna sin. Tá na hÚdaráis Áitiúla freagrach as cothabháil ar Cheantair Dhraenála, a críochnaíodh suas chuig 1943.

Faoi Chlár Oibreacha Cothabhála OPW um Dhraenáil Artaireach, tugtar cosaint do 260,000 heicteár (650,000 acra) de thailte talmhaíochta; cuimsíonn sé 11,500km (7,150 míle) de chainéil abhann agus thart faoi 800km (500 míle) de chlaífoirt.

Completed Scheme Scheme Type County(s) Duration of Works Benefitting Area (Acres)
Carrigahorig Small Arterial Drainage Scheme Offaly, Tipperary 1968-1971 3,800
Maigue Major Arterial Drainage Scheme Cork, Limerick, Tipperary 1973-1986 30,500
Nenagh Minor Arterial Drainage Scheme Offaly, Tipperary 1955-1960 6,500

Forbhreathnú ar na Pleananna um Bainistiú Priacal Tuile 2018

Leagtar amach sa tábla seo a leanas na pobail sa chontae seo atá clúdaithe ag na Pleananna Bainistíochta Riosca Tuilte a seoladh i mí na Bealtaine 2018 agus tugann sé léiriú ar na scéimeanna faoisimh tuilte atá molta sna Pleananna do na pobail seo. Ba chóir a thabhairt faoi deara go soláthraíonn an tábla seo an seasamh ó mhí na Bealtaine 2018 agus d’fhéadfadh stádas roinnt scéimeanna a bheith athraithe ó shin i leith. Léireofar aon athruithe in áit eile san achoimre chontae. Tugtar léiriú ar na scéimeanna um fhaoiseamh tuile atá molta ins na pleananna le haghaidh na bpobal seo. Maidir le roinnt cásanna, léirítear scéim um fhaoiseamh tuile atá inmharthana go teicniúil; beidh gá le measúnú níos mionsonraithe ar chostais agus sochair chun a chinneadh an bhfuil an scéim atá molta indéanta. Maidir le pobail eile, tá priacal íseal tuile ó aibhneacha agus/nó an fharraige agus níl bearta struchtúrtha um fhaoiseamh tuile molta um an dtaca seo. Déanfar athbhreithniú ar an leibhéal reatha priacail ar bhonn rialta amach anseo, gach ceantar san áireamh. I dteannta le feidhmiú na scéimeanna um fhaoiseamh tuile atá molta, beidh maoiniú ar fáil ar bhonn leanúnach le haghaidh tionscadail áitiúla faoin Scéim Mionoibreacha. Leagtar amach freisin ins na pleananna na bearta neamhstruchtúrtha sin atá i bhfeidhm nó atá molta, mar shampla Réamhaisnéis Thuile, a théann chun sochair gach pobal agus réadmhaoin atá faoi phriacal. Leanfaidh an Grúpa Idir-Rannach um Chomhordú Pholasaí Tuile lena chuid oibre anois, agus an saibhreas eolais atá ins na Pleananna mar bhonn eolais acu; tabharfar chun cinn moltaí indéanta breise lena gcur faoi bhráid an Rialtais, mar thacú agus mar chabhair ag teaghlaigh agus ag pobail trí bhearta neamhstruchtúrtha um bainistiú agus maolú priacal tuile.

Area Name Existing Scheme in Place Scheme in Construction, Design or Pending New Scheme Proposed in the Plans Potential Scheme subject to further assessment No Scheme Proposed as Community at Low Risk or Scheme Not Viable
Ardfinnan
Ballyporeen
Bansha
Borrisokane
Borrisoleigh
Cahir
Carrick on Suir
Clogheen
Clonmel
Fethard
Golden
Holycross
Kilsheelan
Knocklofty
Marlfield
Mullinahone
Nenagh
Newcastle
Newport
Roscrea
Templemore
Thurles
Tipperary Town