Lower Lee FRS - Exhibition Report (2017)
This section contains the Exhibition Report and appendices which were prepared in response to the queries raised during the statutory exhibition of the Scheme.
Lower Lee FRS – Exhibition Report – Non Technical Summary (2017)
This section contains the Non-Technical Summary of Exhibition Report and appendices which were prepared in response to the queries raised during the statutory exhibition of the Scheme
LLFRS Supplementary Report on Option of Tidal Barrier (2017)
This is the LLFRS Supplementary Report outlining the consideration of the option of a Tidal Barrier
LLFRS Supplementary Report on Option of Raising Existing Dams (2017)
This is LLFRS Supplementary Report outlining the consideration of the option of raising the existing Hydroelectric Dams
LLFRS Supplementary Report on Option of River Diversions (2017)
This is the LLFRS Supplementary Report on Option on diverting a number of watercourses which were proposed by members of the public.
LLFRS Supplementary Report on Option of Natural Flood Management (2017)
This is LLFRS Supplementary Report outlining the consideration of the option of Natural Flood Management solutions
LLFRS Supplementary Report on Groundwater (2017)
This is the LLFRS Supplementary Report addressing queries from the public on the treatment of groundwater/seepage aspects of the proposed Scheme
Lower Lee FRS Hydrology Report Part 1 (2017)
This is Part 1 of the Lower Lee FRS Hydrology Report which outlines the technical work underpinning the establishment of design flows and hydrograph shapes for the proposed Scheme
Lower Lee FRS Hydrology Report Part 2 (2017)
This is Part 2 of the Lower Lee FRS Hydrology Report which outlines the technical work underpinning the establishment of design flows and hydrograph shapes for the proposed Scheme
Lower Lee FRS Hydrology Report Part 3 (2017)
This is Part 3 of the Lower Lee FRS Hydrology Report which outlines the technical work underpinning the establishment of design flows and hydrograph shapes for the proposed Scheme
LLFRS Options Report (2017)
This is the LLFRS Options Report which outlines the measures and options consider to address the flooding problems in Cork, including the basis for selecting the preferred Scheme
LLFRS Options Report Addendum (2017)
This is an addendum to the LLFRS Options Report which summarises a number of additional options that were consider following the original Options Report
Lower Lee FRS Constraints Study (2014)
This is the Lower Lee FRS Constraints Study which sets out the many constraints to be considered in developing a viable solution for Cork.
Historic news reports of flooding in Cork City have been reproduced on the information posters with the permissions of The Irish Times and the Irish Examiner