350 Publications Available
Your selection:
Dodder CFRAM Plan
Type: Pilot Study Flood Risk Management Plan
Published: 01/02/2011
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Avoca - Vartry River Basin (UOM10)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Ballyteigue - Bannow River Basin (UOM 13)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Bandon - Ilen River Basin (UOM20)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Barrow River Basin (UOM14)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Blackwater (Munster) River Basin (UOM18)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Boyne River Basin (UOM07)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Colligan - Mahon River Basin (UOM17)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Corrib River Basin (UOM30)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Dunmanus - Bantry - Kenmare River Basin (UOM21)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Erne River Basin (UOM36)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Erriff - Clew Bay - Blacksod - Broadhaven River Basin (UOM32-33)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Galway Bay North River Basin (UOM31)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Galway Bay South East River Basin (UOM29)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Laune - Maine - Dingle Bay River Basin (UOM22)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Lee, Cork Harbour & Youghal Bay River Basin (UOM19)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Liffey & Dublin Bay River Basin (UOM09)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Moy & Killala Bay River Basin (UOM34)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Nanny-Delvin River Basin (UOM08)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Neagh Bann River Basin (UOM06)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Nore River Basin (UOM15)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the North Western River Basin (UOM01)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Owenavorragh River Basin (UOM11)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Shannon Estuary North & Mal Bay River Basin (UOM27-28)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Shannon Estuary South River Basin (UOM24)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Shannon Upper & Lower River Basin (UOM25-26)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Slaney & Wexford Harbour River Basin (UOM12)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Sligo Bay & Drowse River Basin (UOM35)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Suir River Basin (UOM16)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Flood Risk Management Plan for the Tralee Bay - Feale River Basin (UOM23)
Type: Flood Risk Management Plan
Published: 19/02/2018
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Lee Catchment Flood Risk Management Plan
Type: Pilot Study Flood Risk Management Plan
Published: 01/10/2009
Published by: Office of Public Works
The Flood Risk Management Plan set out the strategy, including a set of proposed measures, for the cost-effective and sustainable, long-term management of flood risk in the River Basin, including the areas where the flood risk has been determined as being potentially significant.
Download ( .PDF )
Dodder CFRAM Plan SEA Statement
Type: SEA Statement
Published: 07/11/2014
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
East SEA Screening Report UoM08
Type: SEA Screening Report
Published: 26/09/2017
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an SEA will be required.
Download ( .PDF )
East SEA Statement UoM07
Type: SEA Statement
Published: 28/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
East SEA Statement UoM09
Type: SEA Statement
Published: 08/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
East SEA Statement UoM10
Type: SEA Statement
Published: 14/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Lee CFRAM SEA Statement
Type: SEA Statement
Published: 23/10/2009
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
NWNB SEA Statement UoM01
Type: SEA Statement
Published: 14/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
NWNB SEA Statement UoM06
Type: SEA Statement
Published: 24/06/2016
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
NWNB SEA Statement UoM36
Type: SEA Statement
Published: 28/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Shannon CFRAM Study - SEA Statement for Unit of Management 23
Type: SEA Statement
Published: 26/10/2016
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Shannon CFRAM Study - SEA Statement for Unit of Management 24
Type: SEA Statement
Published: 26/10/2016
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Shannon CFRAM Study - SEA Statement for Unit of Management 25-26
Type: SEA Statement
Published: 26/10/2016
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Shannon CFRAM Study - SEA Statement for Unit of Management 27-28
Type: SEA Statement
Published: 26/10/2016
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13 Owenavorragh & Blackwater, Slaney and Ballyteigue - Bannow River Basins Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 22/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13 Owenavorragh & Blackwater, Slaney and Ballyteigue - Bannow River Basins Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 22/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13 Owenavorragh & Blackwater, Slaney and Ballyteigue - Bannow River Basins Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 22/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM14 Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 01/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM15 Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 28/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Eastern CFRAM Study UoM17 Strategic Environmental Assessment Statement
Type: SEA Statement
Published: 21/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Western CFRAM UoM 18 SEA Statement
Type: SEA Statement
Published: 01/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Western CFRAM UoM 19 SEA Statement
Type: SEA Statement
Published: 01/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Western CFRAM UoM 20 SEA Statement
Type: SEA Statement
Published: 01/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Western CFRAM UoM 21 SEA Statement
Type: SEA Statement
Published: 01/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
South Western CFRAM UoM 22 SEA Statement
Type: SEA Statement
Published: 01/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Suir Catchment Flood Risk Assessment Management Study - SEA Statement Suir River Basin
Type: SEA Statement
Published: 10/08/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 29
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 30
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 31
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 32-33
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 34
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
Western CFRAM Study - SEA Statement for Unit of Management 35
Type: SEA Statement
Published: 27/07/2017
Published by: Office of Public Works
This statement summarises how environmental considerations have been integrated in to the Flood Risk Management Plan. It identifies how the Strategic Environmental Assessment (SEA) process has influenced the Flood Risk Management Plan, how responses from consultees have been taken into account, and the reasons for choosing the Flood Risk Management Plan over other alternatives considered.
Download ( .PDF )
East AA NIS UoM07
Type: Natura Impact Statement
Published: 28/07/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
East AA NIS UoM09
Type: Natura Impact Statement
Published: 08/08/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
East AA NIS UoM10
Type: Natura Impact Statement
Published: 08/08/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
East AA Screening report
Type: AA Screening
Published: 17/12/2015
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Eastern CFRAM Screening for Appropriate Assessment UoM08
Type: AA Screening
Published:
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Habitats Directive Article 6 Assessment for the Dodder Catchment
Type: Natura Impact Statement
Published: 14/11/2010
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Lee CFRAM Natura Impact Statement
Type: Natura Impact Statement
Published: 23/10/2009
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
North Western-Neagh Bann CFRAM AA Screening report
Type: AA Screening
Published: 20/11/2015
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
NWNB AA NIS - UoM01
Type: Natura Impact Statement
Published: 01/07/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
NWNB AA NIS - UoM06
Type: Natura Impact Statement
Published: 20/06/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
NWNB AA NIS - UoM36
Type: Natura Impact Statement
Published: 10/06/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Shannon CFRAM Study - Natura Impact Statement for Unit of Management 23
Type: Natura Impact Statement
Published: 26/01/2011
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Shannon CFRAM Study - Natura Impact Statement for Unit of Management 24
Type: Natura Impact Statement
Published: 26/01/2011
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Shannon CFRAM Study - Natura Impact Statement for Unit of Management 25-26
Type: Natura Impact Statement
Published: 26/01/2011
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Shannon CFRAM Study - Natura Impact Statement for Unit of Management 27-28
Type: Natura Impact Statement
Published: 26/01/2011
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM Study UoM11, 12 & 13 Flood Risk Management Plans Natura Impact Statement
Type: Natura Impact Statement
Published: 24/06/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM Study UoM11, 12 & 13 Flood Risk Management Plans Natura Impact Statement
Type: Natura Impact Statement
Published: 24/06/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM StudyUoM11, 12 & 13 Flood Risk Management PlansNatura Impact Statement
Type: Natura Impact Statement
Published: 24/06/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM StudyUoM14 Flood Risk Management Plan Natura Impact Statement
Type: Natura Impact Statement
Published: 29/06/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM Study UoM15 Flood Risk Management Plan Natura Impact Statement
Type: Natura Impact Statement
Published: 18/07/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Eastern CFRAM Study UoM17 Flood Risk Management Plan Natura Impact Statement
Type: Natura Impact Statement
Published: 18/07/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Western CFRAM Natura Impact Statement Laune-Maine-Dingle Bay River Basin (UoM 22)
Type: Natura Impact Statement
Published: 24/08/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Western CFRAM Natura Impact Statement The Munster Blackwater River Basin (UoM18)
Type: Natura Impact Statement
Published: 24/08/2017
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
South Western CFRAM Screening for Appropriate Assessment: Lee - Cork Harbour (UoM 19)
Type: AA Screening
Published: 08/12/2017
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
South Western CFRAM Screening for Appropriate Assessment:Munster Blackwater Catchment (UoM 18)
Type: AA Screening
Published: 08/12/2017
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
South Western CFRAM Screening for Appropriate Assessment: UoM 20
Type: AA Screening
Published: 31/01/2018
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
South Western CFRAM Screening for Appropriate Assessment UoM21
Type: AA Screening
Published: 08/12/2017
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
South Western CFRAM Screening for Appropriate Assessment: UoM22
Type: AA Screening
Published: 08/12/2017
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Suir Catchment Flood Risk Assessment Management Study Natura Impact Statement - UoM16
Type: Natura Impact Statement
Published: 29/09/2016
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 29
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 30
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 31
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 32-33
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 34
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study - Natura Impact Statement for Unit of Management 35
Type: Natura Impact Statement
Published: 01/06/2018
Published by: Office of Public Works
This report/statement was prepared following Appropriate Assessment of Natura 2000 sites as required under the Habitats Directive. The report presents information on the assessment and the process of collating data on the Flood Risk Management Plans and their potential significant impacts on Natura 2000 site(s). Where there are adverse impacts, an assessment of the potential mitigation of those impacts is required.
Download ( .PDF )
Western CFRAM Study UoM 29 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Western CFRAM Study UoM 30 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Western CFRAM Study UoM 31 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Western CFRAM Study UoM 32 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Western CFRAM Study UoM 34 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
Western CFRAM Study UoM 35 Environmental Report
Type: AA Screening
Published: 01/06/2016
Published by: Office of Public Works
This report determines, based on a preliminary assessment and objective criteria, whether the Flood Risk Management Plans, alone and in combination with other plans or projects, could have significant effects on a Natura 2000 site in view of the site’s conservation objectives. Where significant effects are likely, uncertain or unknown at screening stage, an AA will be required.
Download ( .PDF )
AFA Final Designation Report
Type: Designation of the Areas for Further Assessment
Published: 01/03/2012
Published by: Office of Public Works
This report outlines the public consultation and Flood Risk Review processes undertaken for the National Preliminary Flood Risk Assessment (PFRA) as part of the first cycle of the Implementation of the EU 'Floods' Directive in Ireland, and presents the final the list of communities designated as Areas for further Assessment (AFAs).
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Avoca Vartry River Basin (UoM10)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Ballyteigue - Bannow River Basin (UoM13)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Bandon Ilen River Basin (UoM20)
Type: AA Determination (Screening-Out)
Published: 14th March 2018
Published by: Office of Public Works
This report determines and concludes, based on a preliminary assessment and objective criteria, that the Flood Risk Management Plans, alone and in combination with other plans or projects, could not have significant effects on a Natura 2000 site in view of the site’s conservation objectives, and that an AA will not be required.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Barrow River Basin (UoM14)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Boyne River River Basin (UoM07)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Corrib River Basin (UoM30)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Dunmanus Bantry Kenmare River Basin (UoM21)
Type: AA Determination (Screening-Out)
Published: 14th March 2018
Published by: Office of Public Works
This report determines and concludes, based on a preliminary assessment and objective criteria, that the Flood Risk Management Plans, alone and in combination with other plans or projects, could not have significant effects on a Natura 2000 site in view of the site’s conservation objectives, and that an AA will not be required.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Erne River Basin (UoM36)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Erriff-Clew Bay and Blacksod-Broadhaven River Basin (UoM32/33
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Galway Bay North River Basin (UoM31)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Galway Bay South East River Basin (UoM29)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Laune Maine Dingle Bay River Basin (UoM22)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Lee Cork Harbour Youghal Bay River Basin (UoM19)
Type: AA Determination (Screening-Out)
Published: 14th March 2018
Published by: Office of Public Works
This report determines and concludes, based on a preliminary assessment and objective criteria, that the Flood Risk Management Plans, alone and in combination with other plans or projects, could not have significant effects on a Natura 2000 site in view of the site’s conservation objectives, and that an AA will not be required.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Liffey River Basin (UoM09)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Lower and Upper Shannon River Basin (UoM25/26)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Munster Blackwater River Basin (UoM18)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Nanny-Delvin River Basin (UoM08)
Type: AA Determination (Screening-Out)
Published: 14th March 2018
Published by: Office of Public Works
This report determines and concludes, based on a preliminary assessment and objective criteria, that the Flood Risk Management Plans, alone and in combination with other plans or projects, could not have significant effects on a Natura 2000 site in view of the site’s conservation objectives, and that an AA will not be required.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Neagh-Bann River Basin (UoM06)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Nore River Basin (UoM15)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the North-Western River Basin (UoM01)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Owenavorragh - Blackwater River Basin (UoM11)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the River Moy - Killala Bay River Basin (UoM34)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Shannon Estuary North Mal Bay River Basin (UoM27/28)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Shannon Estuary South River Basin (UoM24)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Slaney River Basin (UoM12)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Sligo Bay Drowes River Basin (UoM35)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Suir River Basin (UoM16)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Tralee Bay-Feale River Basin (UoM23)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 – 2015 for Flood Risk Management Plan for the Waterford South Coast River Basin (UoM17)
Type: AA Determination (Concluding)
Published: 14th March 2018
Published by: Office of Public Works
This document sets out the determination by the Office Of Public Works, under the Regulation 42 of the European Communities (Birds and Natural Habitats) Regulations 2011 pursuant to Article 6(3) of the Habitats Directive, that this Flood Risk Management Plan would not adversely affect the integrity of any European site.
Download ( .PDF )
Burnfoot Cost Review Study Summary Report
Type: Cost Review Summary Report
Published: 24/04/2018
Published by: Office of Public Works
The purpose of this report is to present the outputs of a detailed revision of the Burnfoot model and review the cost of flood risk management measures, with the objective of determining if an economically viable measure may exist that could justify the progression to full project-level assessment.
Download ( .PDF )
Camac Options Report
Type: Preliminary Options Report
Published: 01/05/2014
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Dodder CFRAM SEA Environmental Report
Type: SEA Environmental Report
Published: 08/12/2010
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Dunboyne Hydraulic Modelling Report 2019
Type: Map Update Report
Published: 04/04/2019
Published by: Office of Public Works and Meath County Council
This report was prepared to support the flood mapping prepared for the River Tolka in the Dunboyne area.
Download ( .PDF )
East Final Report UoM07
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
East Final Report UoM08
Type: Final Project Report
Published: 01/09/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
East Final Report UoM09
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
East Final Report UoM10
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
East POR UoM07
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
East POR UoM10
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
East Preliminary Options Report UoM09
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
East SEA Environmental Report UoM07
Type: SEA Environmental Report
Published: 20/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
East SEA Environmental Report UoM09
Type: SEA Environmental Report
Published: 20/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
East SEA Environmental Report UoM10
Type: SEA Environmental Report
Published: 20/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
East SEA Scoping Report
Type: SEA Scoping
Published: 13/09/2015
Published by: Office of Public Works
This report details the scoping stage of the Strategic Environmental Assessment (SEA) process that has been undertaken in the preparation of the Flood Risk Management Plan. The purpose of this SEA Scoping Report is to inform stakeholders of the key environmental issues relevant to the Flood Risk Management Plan. The Strategic Environmental Assessment has been completed in accordance with the requirements of the SEA Directive [2001/42/EC].
Download ( .PDF )
East UoM09 Review FFWS & Operating Procedures
Type: FFWS & Operating Procedures
Published: 08/02/2012
Published by: Office of Public Works
Technical Report that reviews the existing flood forecasting systems in place and examines the facilities, such as river and/or rainfall gauging stations, which would be required to operate a real-time localised flood forecasting service for the River Basin. The report examines issues such as potential forecast periods and reliability of forecasts. The report also reviews the operating regulations and procedures of the control structures and dams on the main body of the River to identify potential, acceptable improvements to the operation of the structures with respect to flood risk management.
Download ( .PDF )
Flood Risk Review Report East CFRAM Study Area
Type: Flood Risk Review Reports
Published: 02/09/2011
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Galway City Coastal Wave and Water Level Modelling Study 2020 Report
Type: Coastal Wave and Water Level Modelling Study
Published: 18/02/2021
Published by: Office of Public Works
This report presents the work undertaken and the findings of the Galway City Coastal Wave and Water Level Modelling Study 2020. The findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) presented as output from Phase 2 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 for the Galway Coastal Area Potentially Vulnerable to Wave Overtopping (CAPO).
Download ( .PDF )
Hydraulic Analysis Report for Dodder CFRAMs
Type: Hydraulics Report
Published: 01/08/2008
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Hydraulics Report Eastern CFRAM UoM07
Type: Hydraulics Report
Published: 10/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Hydraulics Report Eastern CFRAM UoM09
Type: Hydraulics Report
Published: 20/12/2013
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Hydraulics Report Eastern CFRAM UoM10
Type: Hydraulics Report
Published: 08/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Hydraulics Report for Raphoe
Type: Hydraulics Report
Published: 04/10/2013
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Hydrolgy Analysis Report for Dodder CFRAMs
Type: Hydrology Report
Published: 13/02/2007
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Hydrology Report Eastern CFRAM UoM07
Type: Hydrology Report
Published: 07/12/2012
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Hydrology Report Eastern CFRAM UoM09
Type: Hydrology Report
Published: 10/04/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Hydrology Report Eastern CFRAM UoM10
Type: Hydrology Report
Published: 29/11/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Hydrology Report for Raphoe
Type: Hydrology Report
Published: 04/10/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Inception Report for Eastern CFRAM UoM07
Type: Inception Report
Published: 01/12/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Inception Report for Eastern CFRAM UoM08
Type: Inception Report
Published: 03/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Inception Report for Eastern CFRAM UoM09
Type: Inception Report
Published: 01/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Inception Report for Eastern CFRAM UoM10
Type: Inception Report
Published: 01/01/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 1 Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 23/10/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 1 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018. Phase 1 of ICWWS 2018 provides an update to the Estimated Extreme Coastal Boundary Water Levels, associated with astronomical tide, storm surge and seiche/local wind set-up allowance, for the coast of Ireland, originally presented as output from the Irish Coastal Protection Strategy Study (ICPSS) undertaken between 2004 and 2013, as well as two further future scenario extreme water level datasets associated with 1.5m (H+EFS) and 2.0m (H++EFS) of Sea Level Rise. The ICPSS had previously provided equivalent extreme coastal water levels for a similar range of Annual Exceedance Probability (AEP) events at the same coastal points or nodes around the coast of Ireland and for the current and two future scenarios (MRFS and HEFS). The latter ICPSS outputs are now superseded by these ICWWS 2018 Phase 1 outputs.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 1 Technical Report - Appendices
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 23/10/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 1 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018. Phase 1 of ICWWS 2018 provides an update to the Estimated Extreme Coastal Boundary Water Levels, associated with astronomical tide, storm surge and seiche/local wind set-up allowance, for the coast of Ireland, originally presented as output from the Irish Coastal Protection Strategy Study (ICPSS) undertaken between 2004 and 2013, as well as two further future scenario extreme water level datasets associated with 1.5m (H+EFS) and 2.0m (H++EFS) of Sea Level Rise. The ICPSS had previously provided equivalent extreme coastal water levels for a similar range of Annual Exceedance Probability (AEP) events at the same coastal points or nodes around the coast of Ireland and for the current and two future scenarios (MRFS and HEFS). The latter ICPSS outputs are now superseded by these ICWWS 2018 Phase 1 outputs.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 2 - Coastal Areas Potentially Vulnerable to Wave Overtopping Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 24/03/2021
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 2 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018. The Phase 2 findings provide an update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 2 - Coastal Areas Potentially Vulnerable to Wave Overtopping Technical Report - Appendices
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 24/03/2021
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 2 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018. The Phase 2 findings provide an update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Bunratty Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 27/11/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 3 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Bunratty. The Phase 3 findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013 for specific flood risk locations considered vulnerable to wave overtopping.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Carlingford Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 26/11/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 3 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Carlingford. The Phase 3 findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013 for specific flood risk locations considered vulnerable to wave overtopping.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Shannon Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 27/11/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 3 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Shannon. The Phase 3 findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013 for specific flood risk locations considered vulnerable to wave overtopping.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Tralee Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 26/11/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 3 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Tralee. The Phase 3 findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013 for specific flood risk locations considered vulnerable to wave overtopping.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 4 - Review of Mean Sea Level and OD Malin Relationship for the Coast of Ireland Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 12/11/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 4 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018. The aim of Phase 4 was to assess and estimate the height difference relationship between Mean Sea Level (MSL) and Ordnance Datum (OD) Malin (OSGM15 and OSGM02) at relevant gauged and non-gauged locations around the coast of Ireland.
Download ( .PDF )
Lee Catchment Flood Risk Assessment and Management Study Hydraulics Report
Type: Hydraulics Report
Published: 07/05/2009
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Lee Catchment Flood Risk Assessment and Management Study Hydrology Report
Type: Hydrology Report
Published: 01/11/2007
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Lee Catchment Flood Risk Assessment and Management Study Inception Report
Type: Inception Report
Published: 24/07/2006
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Lee CFRAM SEA EnvironmentalReport
Type: SEA Environmental Report
Published: 16/10/2009
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Lee CFRAM Study – Final Report
Type: Final Project Report
Published: 01/02/2009
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifiying other key technical reference documents.
Download ( .PDF )
Methodology for Classifying the Vulnerability of National Monuments from Flooding in The Republic of Ireland
Type: PFRA Technical Reports
Published: 01/07/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
National Coastal Flood Hazard Mapping 2021 Flood Mapping Methodology Report
Type: National Coastal Flood Hazard Mapping
Published: 11/06/2021
Published by: Office of Public Works
This report details the methodology used in the National Coastal Flood Hazard Mapping 2021 project to produce updated national scale coastal flood extent and depth maps. Maps were produced for the 50%, 20%, 10%, 5%, 2%, 1%, 0.5% and 0.1% Annual Exceedance Probabilities (AEPs) for the present day scenario and for the Mid-Range Future Scenario (MRFS), High End Future Scenario (HEFS), High+ End Future Scenario (H+EFS) and High++ End Future Scenario (H++EFS) which represent a 0.5m, 1.0m, 1.5m and 2.0m increase in sea level respectively.
Download ( .PDF )
National Indicative Fluvial Mapping Project: Final Report
Type: National Indicative Fluvial Mapping (NIFM) Project
Published: 29/10/2020
Published by: Office of Public Works
This report details the methodology used to produce indicative fluvial flood maps under the National Indicative Fluvial Mapping (NIFM) Project. The report includes details of the methodology, data used, processing, and a critical assessment of the method.
Download ( .PDF )
National Pluvial Screening Project for Ireland
Type: PFRA Technical Reports
Published: 01/11/2010
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
North-West and Neagh-Bann Flood Risk Review Final Report May 2012
Type: Flood Risk Review Reports
Published: 04/10/2011
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 01 Hydraulics Report
Type: Hydraulics Report
Published: 16/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 01 Hydrology Report
Type: Hydrology Report
Published: 03/07/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 01 Inception Report
Type: Inception Report
Published: 18/10/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 06 Hydraulics Report
Type: Hydraulics Report
Published: 23/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 06 Hydrology Report
Type: Hydrology Report
Published: 24/10/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 06 Inception Report
Type: Inception Report
Published: 30/11/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 36 Hydraulics Report
Type: Hydraulics Report
Published: 12/06/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 36 Hydrology Report
Type: Hydrology Report
Published: 08/11/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
North Western - Neagh Bann CFRAM Study UoM 36 Inception Report
Type: Inception Report
Published: 30/11/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
NWNB Final Report UoM01
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
NWNB Final Report UoM06
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
NWNB Final Report UoM36
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
NWNB POR UoM01
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
NWNB POR UoM06
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
NWNB POR UoM36
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
NWNB SEA Environmental Report UoM01
Type: SEA Environmental Report
Published: 05/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
NWNB SEA Environmental Report UoM06
Type: SEA Environmental Report
Published: 24/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
NWNB SEA Environmental Report UoM36
Type: SEA Environmental Report
Published: 16/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
NWNB SEA Scoping Report
Type: SEA Scoping
Published: 14/09/2015
Published by: Office of Public Works
This report details the scoping stage of the Strategic Environmental Assessment (SEA) process that has been undertaken in the preparation of the Flood Risk Management Plan. The purpose of this SEA Scoping Report is to inform stakeholders of the key environmental issues relevant to the Flood Risk Management Plan. The Strategic Environmental Assessment has been completed in accordance with the requirements of the SEA Directive [2001/42/EC].
Download ( .PDF )
Options Development Report with Multi Criteria Analysis Dodder CFRAMs
Type: Preliminary Options Report
Published: 05/03/2009
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
PFRA Main Report
Type: PFRA Main Report
Published: 01/03/2012
Published by: Office of Public Works
This report provides an overview of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive, including the public consultation on the PFRA and the final the list of communities designated as Areas for further Assessment (AFAs).
Download ( .PDF )
Poddle Options Report
Type: Preliminary Options Report
Published: 08/07/2014
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Preliminary Flood Risk Analysis Report - Waterways Ireland
Type: PFRA Technical Reports
Published: 01/07/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Preliminary Flood Risk Analysis Report - Waterways Ireland - Appendices
Type: PFRA Technical Reports
Published: 01/07/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .ZIP )
Preliminary Flood Risk Assessment – ESB Dams and Embankments
Type: PFRA Technical Reports
Published: 01/06/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Preliminary Flood Risk Assessment - Fluvial Flood Hazard Mapping - Normal Depth Method
Type: PFRA Technical Reports
Published: 01/07/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Preliminary Flood Risk Assessments - Groundwater Flooding
Type: PFRA Technical Reports
Published: 01/06/2010
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Preliminary Options Screening Report Dodder CFRAMs
Type: Preliminary Options Report
Published: 31/10/2008
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Project Inception Report Dodder
Type: Inception Report
Published: 13/02/2007
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Public Consultation on the Draft Flood Risk Management Plans - Summary Report
Type: Public Consultation Synthesis Report
Published: 01/12/2017
Published by: Office of Public Works
This report describes the process and outcomes of the public and stakeholder consultation that were undertaken in relation to the Draft Flood Risk Management Plans (FRMPs). The draft FRMPs were produced as part of the National CFRAM Programme that was undertaken to deliver on the national flood policy and as part of the Implementation of the first cycle of the EU 'Floods' Directive.
Download ( .PDF )
Raphoe POR
Type: Preliminary Options Report
Published: 16/06/2014
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Shannon Callows Pinch Point Study
Type: Study
Published: 15/11/2019
Published by: Office of Public Works
A Study to estimate the possible benefits of a number of measures to potentially reduce summer flood levels while maintaining the navigation channel between Athlone and Meelick Weir.
Download ( .PDF )
Shannon CFRAM Study - Flood Forecasting Systems (FFWS) Scoping Report for Unit of Management 25-26
Type: Flood Forecasting Systems (FFWS) ScopingReport
Published: 26/01/2011
Published by: Office of Public Works
Technical Report that reviews the existing flood forecasting systems in place and examines the facilities, such as river and/or rainfall gauging stations, which would be required to operate a real-time localised flood forecasting service for the catchment. The report also examines issues such as potential forecast periods and reliability of forecasts.'
Download ( .PDF )
Shannon CFRAM Study - Flood Risk Review Report
Type: Flood Risk Review Reports
Published: 26/01/2011
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Shannon CFRAM Study - Hydraulics Report for Unit of Management 23
Type: Hydraulics Report
Published: 26/01/2011
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Shannon CFRAM Study - Hydraulics Report for Unit of Management 24
Type: Hydraulics Report
Published: 26/01/2011
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Shannon CFRAM Study - Hydraulics Report for Unit of Management 25-26
Type: Hydraulics Report
Published: 26/01/2011
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Shannon CFRAM Study - Hydraulics Report for Unit of Management 27-28
Type: Hydraulics Report
Published: 26/01/2011
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Shannon CFRAM Study - Hydrology Report for Unit of Management 23
Type: Hydrology Report
Published: 26/01/2011
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Shannon CFRAM Study - Hydrology Report for Unit of Management 24
Type: Hydrology Report
Published: 26/01/2011
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Shannon CFRAM Study - Hydrology Report for Unit of Management 25-26
Type: Hydrology Report
Published: 26/01/2011
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Shannon CFRAM Study - Hydrology Report for Unit of Management 27-28
Type: Hydrology Report
Published: 26/01/2011
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Shannon CFRAM Study - Inception Report for Unit of Management 23
Type: Inception Report
Published: 26/01/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Shannon CFRAM Study - Inception Report for Unit of Management 24
Type: Inception Report
Published: 26/01/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Shannon CFRAM Study - Inception Report for Unit of Management 25-26
Type: Inception Report
Published: 26/01/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Shannon CFRAM Study - Inception Report for Unit of Management 27
Type: Inception Report
Published: 26/01/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Shannon CFRAM Study - Inception Report for Unit of Management 28
Type: Inception Report
Published: 26/01/2011
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Shannon CFRAM Study - Level Operations Report for Unit of Management 25-26
Type: Level Operations Report
Published: 26/01/2011
Published by: Office of Public Works
Technical report detailing the review of operating regulations and procedures of the control structures and dams on the main body of the river (as operated by e.g. ESB and Waterways Ireland), to identify potential, acceptable improvements to the operation of the structures with respect to flood risk management.
Download ( .PDF )
Shannon CFRAM Study - Preliminary Options Report for Unit of Management 24
Type: Preliminary Options Report
Published: 26/01/2011
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Shannon CFRAM Study - Preliminary Options Report for Unit of Management 25-26
Type: Preliminary Options Report
Published: 26/01/2011
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Shannon CFRAM Study - Preliminary Options Report for Unit of Management 27-28
Type: Preliminary Options Report
Published: 26/01/2011
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Shannon CFRAM Study - Preliminary Options Report for UOM23
Type: Preliminary Options Report
Published: 26/01/2011
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Shannon CFRAM Study - SEA Environmental Report for Unit of Management 23
Type: SEA Environmental Report
Published: 26/01/2011
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Shannon CFRAM Study - SEA Environmental Report for Unit of Management 24
Type: SEA Environmental Report
Published: 26/01/2011
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Shannon CFRAM Study - SEA Environmental Report for Unit of Management 25-26
Type: SEA Environmental Report
Published: 26/01/2011
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Shannon CFRAM Study - SEA Environmental Report for Unit of Management 27-28
Type: SEA Environmental Report
Published: 26/01/2011
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs11-12-13
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs11-12-13
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs11-12-13
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs14
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs15
Type: Final Project Report
Published: 01/07/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Final Report for UoMs17
Type: Final Project Report
Published: 01/08/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Eastern CFRAM Study - Flood Risk Review
Type: Flood Risk Review Reports
Published: 18/10/2011
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoM14
Type: Hydraulics Report
Published: 02/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoM15
Type: Hydraulics Report
Published: 15/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoM17
Type: Hydraulics Report
Published: 22/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoMs 11-12-13
Type: Hydraulics Report
Published: 29/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoMs 11-12-13
Type: Hydraulics Report
Published: 29/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydraulics Report for UoMs 11-12-13
Type: Hydraulics Report
Published: 29/05/2014
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoM14
Type: Hydrology Report
Published: 08/07/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoM 15
Type: Hydrology Report
Published: 13/05/13
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoMs 11-12-13
Type: Hydrology Report
Published: 02/09/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoMs 11-12-13
Type: Hydrology Report
Published: 02/09/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoMs 11-12-13
Type: Hydrology Report
Published: 02/09/2013
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Hydrology Report for UoMs 17
Type: Hydrology Report
Published: 30/09/13
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Eastern CFRAM Study - Inception Report for UoM14
Type: Inception Report
Published: 03/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Eastern CFRAM Study - Inception Report for UoM15
Type: Inception Report
Published: 03/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Eastern CFRAM Study - Inception Report for UoMs 11-12-13
Type: Inception Report
Published: 01/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Eastern CFRAM Study - Inception Report for UoMs 11-12-13
Type: Inception Report
Published: 01/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Eastern CFRAM Study - Inception Report for UoMs 11-12-13
Type: Inception Report
Published: 01/02/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoM14
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoM15
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoM17
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoMs11-12-13
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoMs11-12-13
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study - Preliminary Options Report UoMs11-12-13
Type: Preliminary Options Report
Published: 29/01/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13 Strategic Environmental Assessment Environmental Report
Type: SEA Environmental Report
Published: 24/06/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13 Strategic Environmental Assessment Environmental Report
Type: SEA Environmental Report
Published: 24/06/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study UoM 11, 12 and 13Strategic Environmental AssessmentEnvironmental Report
Type: SEA Environmental Report
Published: 24/06/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study UoM14 Strategic Environmental Assessment Environmental Report
Type: SEA Environmental Report
Published: 30/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study UoM15 Strategic Environmental Assessment Environmental Report
Type: SEA Environmental Report
Published: 18/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Eastern CFRAM Study UoM17 Strategic Environmental Assessment Environmental Report
Type: SEA Environmental Report
Published: 18/07/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study - Flood Risk Review Report
Type: Flood Risk Review Reports
Published: 01/02/2012
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
South Western CFRAM Study UoM 18 Environmental Report
Type: SEA Environmental Report
Published: 05/10/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study UoM 18 Final Report
Type: Final Project Report
Published: 04/09/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Western CFRAM Study UoM 18 Hydraulics Report
Type: Hydraulics Report
Published: 01/06/2016
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Western CFRAM Study UoM 18 Hydrology Report
Type: Hydrology Report
Published: 01/06/2016
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Western CFRAM Study UoM 18 Inception Report
Type: Inception Report
Published: 01/09/2013
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Western CFRAM Study UoM 18 Preliminary Options Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Western CFRAM Study UoM 19 Environmental Report
Type: SEA Environmental Report
Published: 05/10/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study UoM 19 Final Report
Type: Final Project Report
Published: 05/09/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Western CFRAM Study UoM 19 Hydraulics Report
Type: Hydraulics Report
Published: 01/06/2016
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Western CFRAM Study UoM 19 Hydrology Report
Type: Hydrology Report
Published: 01/06/2016
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Western CFRAM Study UoM 19 Inception Report
Type: Inception Report
Published: 01/09/2013
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Western CFRAM Study UoM 19 Preliminary Options Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Western CFRAM Study UoM 20 Environmental Report
Type: SEA Environmental Report
Published: 05/10/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study UoM 20 Final Report
Type: Final Project Report
Published: 15/01/2018
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Western CFRAM Study UoM 20 Hydraulics Report
Type: Hydraulics Report
Published: 01/06/2016
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Western CFRAM Study UoM 20 Hydrology Report
Type: Hydrology Report
Published: 01/06/2016
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Western CFRAM Study UoM 20 Inception Report
Type: Inception Report
Published: 01/09/2013
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Western CFRAM Study UoM 20 Preliminary Options Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Western CFRAM Study UoM 21 Environmental Report
Type: SEA Environmental Report
Published: 05/10/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study UoM 21 Final Report
Type: Final Project Report
Published: 05/09/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Western CFRAM Study UoM 21 Hydraulics Report
Type: Hydraulics Report
Published: 01/06/2016
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Western CFRAM Study UoM 21 Hydrology Report
Type: Hydrology Report
Published: 01/06/2016
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Western CFRAM Study UoM 21 Inception Report
Type: Inception Report
Published: 01/09/2013
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Western CFRAM Study UoM 21 Preliminary Options Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
South Western CFRAM Study UoM 22 Environmental Report
Type: SEA Environmental Report
Published: 05/10/2017
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
South Western CFRAM Study UoM 22 Final Report
Type: Final Project Report
Published: 05/09/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
South Western CFRAM Study UoM 22 Hydraulics Report
Type: Hydraulics Report
Published: 01/06/2016
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
South Western CFRAM Study UoM 22 Hydrology Report
Type: Hydrology Report
Published: 01/06/2016
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
South Western CFRAM Study UoM 22 Inception Report
Type: Inception Report
Published: 01/09/2013
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
South Western CFRAM Study UoM 22 Preliminary Options Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Streamtown Mapping Update Report
Type: Map Update Report
Published: 12/02/2018
Published by: Office of Public Works
This report was produced to document the work completed to updated the flood mapping in the Streamstown area of Malahide.
Download ( .PDF )
Suir Catchment Flood Risk Assessment Management Study Strategic Environmental Assessment Environmental Report UoM16
Type: SEA Environmental Report
Published: 16/09/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Suir CFRAM Study Preliminary Options Report UoM16
Type: Preliminary Options Report
Published: Aug 2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Suir CFRAM Study UoM 16 Final Project Report
Type: Final Project Report
Published: 08/12/2017
Published by: Office of Public Works
Final CFRAM Summary Project Report outlining overarching methodology and identifying other key technical reference documents.
Download ( .PDF )
Suir CFRAM Study UoM16 Hydraulics Report
Type: Hydraulics Report
Published: 28/05/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Suir CFRAM Study UoM16 Hydrology Report
Type: Hydrology Report
Published: 16/07/2015
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Suir CFRAM Study UoM16 Rating Review Report
Type: Hydrology Report
Published: 14/08/2009
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
The Predictive Assessment of Potentially Significant Flood Risk
Type: PFRA Technical Reports
Published: 01/06/2011
Published by: Office of Public Works
This report describes one technical aspect of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Weighting The Perceived Importance of Minimising Economic, Social and Environmental/Cultural Risks In Flood Risk Management
Type: Weighting The Perceived Importance of Minimising Economic, Social and Environmental/ Cultural Risks In Flood Risk Management
Published: 27/11/2015
Published by: Office of Public Works
This report describes the process and findings of the public consultation and analysis undertaken to determine the appropriate weightings for the global objectives that form part of the Multi-Criteria Analysis used for the assessment of flood risk management options.
Download ( .PDF )
Western CFRAM Flood Risk ReviewFinal Report
Type: Flood Risk Review Reports
Published: 01/11/2011
Published by: Office of Public Works
This report provides an overview and the outcomes of the Flood Risk Review process undertaken as part of the process undertaken to implement the National Preliminary Flood Risk Assessment (PFRA) in Ireland as part of the first cycle of the Implementation of the EU 'Floods' Directive.
Download ( .PDF )
Western CFRAM Study UoM 29 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Study UoM 30 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Study UoM 31 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Study UoM 32 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Study UoM 34 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Study UoM 35 Environmental Report
Type: SEA Environmental Report
Published: 01/06/2016
Published by: Office of Public Works
This report identifies, evaluates, and describes the likely significant effects on the environment of implementing the Flood Risk Management Plan. It details alternatives considered, and proposals for mitigation and monitoring to ensure potential impacts are minimised. It contains the information required by Annex I of the SEA Directive [2001/42/EC] and is the main output from the SEA process.
Download ( .PDF )
Western CFRAM Unit of Management 29 Final Preliminary Options Report
Type: Preliminary Options Report
Published: 01/03/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 29 - Galway Bay South East Final Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of management 29 – Galway Bay South East Hydrology Report Final Report
Type: Hydrology Report
Published: 01/02/2012
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Western CFRAM Unit of Management 29 - Galway Bay South East Inception Report Final Report
Type: Inception Report
Published: 23/01/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western CFRAM Unit of Management 30 and 31 - Corrib and Owengowla Final Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of Management 30 and 31 -Corrib and Owengowla Final Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of management 30 - Corrib Hydrology Report Final report
Type: Hydrology Report
Published: 01/02/2014
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Western CFRAM Unit of Management 30Final Preliminary Options Report: Volume 1 - Overarching Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 31 Final Preliminary Options Report:Volume 1 - Overarching Report
Type: Preliminary Options Report
Published: 01/07/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 32-33 Final Preliminary Options Report: Volume 1 - Overarching Report
Type: Preliminary Options Report
Published: 01/12/2015
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 32 - Erriff and Clew BayFinal Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of Management 32 – Erriff-Clew BayHydrology Report Final report
Type: Hydrology Report
Published: 01/02/2014
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Western CFRAM Unit of Management 34 Final Preliminary Options Report: Volume 1 - Overarching Report
Type: Preliminary Options Report
Published: 01/10/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 34 - Moy and Killala BayFinal Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of management 34 - Moy and Killala BayHydrology Report Final Report
Type: Hydrology Report
Published: 01/09/2014
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Western CFRAM Unit of Management 34 - Moy and Killala BayInception Report Final Report
Type: Inception Report
Published: 29/06/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western CFRAM Unit of Management 35 Final Preliminary Options Report: Volume 1 - Overarching Report
Type: Preliminary Options Report
Published: 01/05/2016
Published by: Office of Public Works
This report describes the process by which, once the flood risk to an area is identified and quantified, the most appropriate structural or non structural FRM measures are screened, developed and appraised against a range of flood risk management objectives to identify potential solutions. The report gives an overview of this analysis which, in combination with public consultation, has informed the preferred measures that were taken forward to the Flood Risk Management Plan.
Download ( .PDF )
Western CFRAM Unit of Management 35 -Sligo Bay and Drowes Final Hydraulic Modelling Report
Type: Hydraulics Report
Published: 04/09/2015
Published by: Office of Public Works
This report provides information relating to the data used for the hydraulic modelling that was carried out within the study area. The report includes full detail on hydraulic model information that was used as input material, model schematisation and construction, sensitivity analysis, calibration, verification, model limitations and handover notes. This information is provided as a single source of reference for each AFA studied as part of the CFRAM study and formed the basis for the CFRAM mapping.
Download ( .PDF )
Western CFRAM Unit of management 35 - Sligo Bay/Drowes Hydrology Report Final Report
Type: Hydrology Report
Published: 01/02/2014
Published by: Office of Public Works
Technical report detailing the review of historic floods; the analysis of river flow, water level and rainfall data; and the analysis of catchments and sub-catchments, in order to derive estimates, for a range of design event probabilities, of peak fluvial flood flows and hydrographs, coastal flood levels, and their joint probability of occurrence, throughout the Study area. The report describes the calibration, validation and sensitivity tests of the results, and considers the impacts of future environmental and catchment changes.
Download ( .PDF )
Western CFRAM Unit of Management 35 - Sligo Bay/Drowes Inception Report Final Report
Type: Inception Report
Published: 29/06/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western CFRAM Units of Management 30 - Corrib and 31 - Owengowla Inception Report Final Report
Type: Inception Report
Published: 29/06/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western CFRAM Units of Management 30 - Corrib and 31 - Owengowla Inception Report Final Report
Type: Inception Report
Published: 29/06/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western CFRAM Units of Management 32 - Erriff-Clew Bay and 33 - Blacksod-Broadhaven Inception Report Final Report
Type: Inception Report
Published: 29/06/2012
Published by: Office of Public Works
Report providing a detailed methodology statement for three key initial areas of work in the CFRAM Studies, namely data collection, specification of the topographical survey and the hydrological analysis and modelling. The report includes a list of historical floods, with such information as dates, flood mechanisms and impacts. A list of data identified at the inception stage is included, as are any critical constraints or data gaps and an assessment of the impact of those gaps.
Download ( .PDF )
Western River Basin District Catchment-based Flood Risk Assessment and Management (CFRAM) Strategic Environmental Assessment Scoping Report
Type: SEA Scoping
Published: 01/07/2013
Published by: Office of Public Works
This report details the scoping stage of the Strategic Environmental Assessment (SEA) process that has been undertaken in the preparation of the Flood Risk Management Plan. The purpose of this SEA Scoping Report is to inform stakeholders of the key environmental issues relevant to the Flood Risk Management Plan. The Strategic Environmental Assessment has been completed in accordance with the requirements of the SEA Directive [2001/42/EC].
Download ( .PDF )
Wexford and Burrow Coastal Wave and Water Level Modelling Study 2020 Report
Type: Coastal Wave and Water Level Modelling Study
Published: 30/04/2021
Published by: Office of Public Works
This report presents the work undertaken and the findings of the Wexford and Burrow Coastal Wave and Water Level Modelling Study 2020. The findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) presented as output from Phase 2 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 for the Wexford and Burrow Coastal Areas Potentially Vulnerable to Wave Overtopping (CAPOs).
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Dundalk Technical Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 28/10/2020
Published by: Office of Public Works
This report presents the work undertaken and the findings of Phase 3 of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Dundalk. The Phase 3 findings provide an improvement and update to the wave climate and water level combinations of known Annual Exceedance Probability (AEP) originally presented as output from the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2013 for specific flood risk locations considered vulnerable to wave overtopping.
Download ( .PDF )
Irish Coastal Wave and Water Level Modelling Study 2018 Phase 3 - Dundalk Extension Report
Type: Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018
Published: 29/08/2023
Published by: Office of Public Works
This report presents the work undertaken and findings of the Phase 3 extension of the Irish Coastal Wave and Water Level Modelling Study (ICWWS) 2018 at Dundalk. This extension has built upon the work previously undertaken for Phase 3, whereby a further set of simulations have been undertaken, with the purpose of deriving one additional joint probability wave and water level combination for each of the six estimation locations identified for Dundalk for the present day scenario, Mid-Range Future Scenario (MRFS) and High End Future Scenario (HEFS).
Download ( .PDF )