The Minor Flood Mitigation Works and Coastal Protection Scheme was introduced by the Office of Public Works in 2009. The purpose of the scheme is to provide funding to Local Authorities to undertake minor flood mitigation works or studies to address localised flooding and coastal protection problems within their administrative areas. The scheme generally applies where a solution can be readily identified and achieved in a short time frame.
Under the scheme, applications are considered for projects that are estimated to cost not more than €750,000 in each instance. Funding of up to 90% of the cost is available for approved projects. Applications are assessed by the OPW having regard to the specific economic, technical social and environmental criteria of the scheme, including a cost benefit ratio.
Works that are normally the responsibility of the local authorities will generally not be considered for OPW funding. Where such works would also mitigate the risk of flooding to properties, partial funding may be considered by OPW. The Local Authorities must be satisfied that the works will not have a significant impact on flood risk elsewhere. The commencement and progression of any works for which funding is approved is a matter for each Local Authority concerned.
The table below shows a list of minor works projects for which funding has been approved. Minor Works Scheme Explanatory Leaflets and Application Forms can be found on gov.ie
Last Updated: 12/05/2025
Local Authority | Project Location | Project Details | Approved Funding (€) | Approval Year |
---|---|---|---|---|
Donegal County Council | Meenaniller, L-1363-2 | Upgrading of 600mm pipe with 900mm pipe; Installation of 1200mm pipe; Culvert replacement. | 73,044 | 2010 |
Donegal County Council | Pairc an Grainan Burnfoot | To construct 25m shuttered wall at sewerage treatment plant To reshape corner of embankment to provide better flow | 4,050 | 2013 |
Donegal County Council | Ballindrait | Construct new twin 900mm sluice Regrade, clean and/or widen existing channel Construct 900mm diameter bypass culvert | 45,900 | 2014 |
Donegal County Council | Magherawarden Burn Portsalon | To direct stream away from the dunes | 20,000 | 2013 |
Donegal County Council | Inver | Installation of rock armour to protect the existing falling sea wall | 36,000 | 2016 |
Donegal County Council | Fahan Marina | Repair collapsed sea wall | 18,000 | 2010 |
Donegal County Council | Stranorlar-Ballybofey | Vegetation and tree removal on embankment & construction of sumps / pumping areas | 157,500 | 2018 |
Donegal County Council | Lower Mount Merrion Milford | Clean open drain | 1,800 | 2016 |
Donegal County Council | Portnoo to Dooey Point | Coastal Flooding and Erosion Risk Management Study | 76,500 | 2017 |
Donegal County Council | Chapel Street Carndonagh | Removal of existing undersized culvert & replace with upsized box culvert, channel improvements & maintenance to the stream | 16,290 | 2014 |
Donegal County Council | Rasheeny Culvert Ballyliffen | Replace 3 pipes with a box culvert | 13,500 | 2013 |
Donegal County Council | Ecclesiastical Graveyard Inver Glebe | Installation of 60m rock armour along the Eany Water River bank to protect the old graveyard and ecclesiastical remains | 13,500 | 2016 |
Donegal County Council | Sloddan Port to Binbane Head (to include Pollan Strand, Ballyliffin & Five Fingers Strand) | Coastal Erosion Risk Management Study | 76,500 | 2016 |
Donegal County Council | Foxwood | Clear vegetation for approximately 850m Minor widening of river & sweetening of corners for approximately 850m Increase height of embankment behind houses | 18,000 | 2014 |
Donegal County Council | Burnfoot River | Construct earthen embankment / Investigate underground drainage & upgrade where required | 67,500 | 2010 |
Donegal County Council | Ranamona Island Causeway | To re-set & rebuild existing boulders and import replacement boulders | 10,800 | 2019 |
Donegal County Council | Stranorlar-Ballybofey | Construction of pump, 2 storm water manholes & associated works | 101,865 | 2021 |
Donegal County Council | Murvagh Upper Glebe, Drumchory Glebe Mullanacross and Ballybulgan | To undertake a review of the existing flood data to identify measures that could be implemented, to mitigate against future flooding of this area | 13,500 | 2018 |
Donegal County Council | Derrybeg | Bunding behind private dwelling | 58,500 | 2010 |
Donegal County Council | Cladyknit | Study | 3,600 | 2010 |
Donegal County Council | Oatfield Terrace Letterkenny | Removal of structurally damaged pipes & installation of box culvert 3m x 2.1m | 224,460 | 2018 |
Donegal County Council | Murvagh Upper Glebe Drumchory Glebe Mullanacross and Ballybulgan | To undertake a review of the existing flood data to identify measures that could be implemented, to mitigate against future flooding of this area | 764 | 2019 |
Donegal County Council | Currindale Termon | To construct rock armour 150m long by 1m high between river and road & associated works. | 31,500 | 2019 |
Donegal County Council | Elmwood Downes Letterkenny | Provide storm drain & connection manholes. Connect drain to existing storm system Provide land drainage at embankment | 16,000 | 2012 |
Donegal County Council | Glack Inch Island | Construct a new 900mm or 1050mm pipe culvert & construct an inlet headwall & a self cleaning grid | 24,300 | 2014 |
Donegal County Council | Glen Road Carvery Burnfoot | Construct bund along existing river and tributary. Construct 450mm diameter overflow pipe Construct ramp across house access River cleaning and associated works | 16,200 | 2012 |
Donegal County Council | Lifford- N15 | Provision of 3 cattle grids or gulley systems & new 900mm diameter pipe for approx 45m Cleaning existing open drains & stream and create new open drains as required Road crossing of national primary road(length 13m) | 54,000 | 2014 |
Donegal County Council | Inver | Construct a row of rock armour along the line of the existing gabions in order to protect them from further damage | 18,000 | 2020 |
Donegal County Council | Maghery (Maghery Bay Coastal Flooding and Erosion Risk Management Study) | Coastal Flooding and Erosion Risk Management Study | 76,500 | 2018 |
Donegal County Council | Milford (Drumbern) | To divert 600m of drainage to opposite side of road, increase size of outlet pipe & construct manhole | 5,000 | 2013 |
Donegal County Council | Inch Island Causeway | Strengthen existing wall & build new wall | 54,000 | 2010 |
Donegal County Council | Downings Beach | Rock armour protection to base of damaged embankment- restore embankment with granular material | 45,000 | 2013 |
Donegal County Council | Downings | Replacement of existing box culvert with larger box culvert. Reinstatement of parapet walls. Improvements to river channel | 63,000 | 2011 |
Donegal County Council | Main St. Rathmullen | To put a new road crossing 50m to the south at a higher level, and associated works | 31,500 | 2011 |
Donegal County Council | Liscooley | Study to assess capacity issues within watercourse & interaction with infrastructure | 2,866 | 2020 |
Donegal County Council | Liscooley | Study to assess capacity issues within watercourse & interaction with infrastructure | 7,650 | 2019 |
Donegal County Council | Magheraroarty (Ballyness Bay Coastal Flooding and Erosion Risk Management Study) | Coastal Flooding and Erosion Risk Management Study | 76,500 | 2018 |
Donegal County Council | Inishfree Bay | Coastal Flooding and Erosion Risk Management Study | 76,500 | 2016 |
Donegal County Council | Circular Road Letterkenny | Installation of 98m of 750 diameter pipes | 51,773 | 2018 |
Donegal County Council | Inver | It is proposed to construct a row of rock armour along the line of the existing gabions in order to protect these gabions from further damage. | 45,000 | 2025 |
Donegal County Council | Ard na gCeapairi, R257 | Replacement of existing 600mm pipe and stone culvert with box culvert and two manholes, together with road crossing and accommodation works on two dwellings | 29,700 | 2010 |
Donegal County Council | Bridgend | Install additional drainage pipes & ancillary works | 34,200 | 2013 |
Donegal County Council | Donegal Town | Upgrade works to walls along the river bank, install 3 large diameter non-return valves, purchase flood barrier (100m), construct an earthen bund 70m, replace the existing culvert with a new culvert 3.0m wide by 1.8m high, removal of overhanging trees from the banks of the river & associated works | 369,000 | 2019 |
Donegal County Council | Meenaniller | Study | 7,200 | 2010 |
Donegal County Council | Bundoran Rogay beach | Rock fall protection | 90,000 | 2010 |
Donegal County Council | An Seascann Beag, L-1263 | Replacement of O' Fearraigh Bridge & Fred Coll's Bridge | 78,435 | 2010 |
Donegal County Council | Eastend Bundoran | Placement of larger capacity pipes at several locations | 27,000 | 2010 |