The Minor Flood Mitigation Works and Coastal Protection Scheme (Minor Works Scheme) was introduced by the Office of Public Works in 2009.
The purpose of the Minor Works Scheme is to provide funding to Local Authorities towards undertaking studies and/or works within their administrative areas for:
There are three broad categories of projects funded under the Minor Works Scheme: studies, works, or studies and associated works. The Minor Works Scheme generally applies where a solution can be readily identified and achieved in a short time frame.
The Scheme is also available for local authorities to introduce interim measures for those communities, where a major flood relief scheme is planned, but not yet complete. Applications for interim measures will only be considered up to the time of an application for planning consent for a major scheme.
The Local Authority is responsible for the delivery of the project, including obtaining all required consents and ensuring flood/erosion risks are not caused elsewhere by the proposed works.
Funding under the Minor Works Scheme does not include:
Under the Scheme, applications for funding, from a Local Authority Chief Executive or Director of Services, are considered for projects up to €2 million each, and studies up to €750,000 each.
The OPW’s contribution to approved projects is 90% for the first €300,000 approved and increases to 95% for the balance of approved funding above €300,000 up to €2 million. Any expenditure for projects above the approved limits (and approved amounts for individual applications) remains the responsibility of the Local Authority to provide from their own resources to complete the study/works.
Applications are assessed by the OPW having regard to specific criteria, which includes both technical and economic criteria for the overall project. The economic criteria includes the works achieving a benefit cost ratio of 1 or parity, using the prescribed valuations for the scheme.
The application and approval process is subject to the amount of funding sought and type of works. For studies and works up to €750,000, called Band 1 projects, there are two application forms, one for flood (coastal and non-coastal) related projects and a separate form for coastal erosion related projects. The OPW will assess Band 1 project applications against the scheme’s criteria, having regard to the national programme for flood relief schemes and the work underway on the development of a National Coastal Change Management Strategy.
For those works (study and works) for flood mitigation projects above €750,000 up to €2 million, called Band 2 projects, a three step governance framework is applied:
At each gateway, the OPW will assess Band 2 project applications against the scheme’s criteria and the national programme for flood relief schemes and the work underway on the development of a National Coastal Change Management Strategy. The criteria for the Minor Works Scheme will be kept under review by the OPW.
The table below shows a list of projects for which funding has been approved. Further information and the application forms to the Minor Works Scheme are available on gov.ie
Last Updated: 01/07/2026
| Local Authority | Project Location | Project Details | Approved Funding (€) | Approval Year |
|---|---|---|---|---|
| Kerry County Council | Flesk River (phase 1 & 2) | Clearance of vegetation of the river bank between Curreal Bridge at Glenflesk Village to Gortahoosh Bridge & Loo Bridge and associated works | 7,661 | 2020 |
| Kerry County Council | Kilfenora Fenit | Detailed Design Stage | 176,166 | 2018 |
| Kerry County Council | Gallarus Ballydavid | To clean silt and sand from rivers & estuary of rivers | 6,300 | 2011 |
| Kerry County Council | Ballyheigue Cliff Stabilisation | The scheme is designed to stabilise a 50m length of the Ballyheigue coastline that was suffering sever erosion and was in imminent risk of causing the undermining Head Road. The works involved stabilising this section consisted of the construction of a new concrete anchor block including ground anchorages the importation and placement of suitable rock armour type fill material the provision of geotextile layers, the provision of gabion mattressing and the top soiling of stabilised area. | 106,037 | 2024 |
| Kerry County Council | Tullig Castleisland | Raising of retaining wall, culvert replacement at Tullig, storm water drainage pipe at Kilbannivane & associated works | 58,520 | 2016 |
| Kerry County Council | Fenit Road | Fenit Road Coastal Protection Scheme – Rock revetment & buttressing embankments | 360,000 | 2009 |
| Kerry County Council | Cromane | Embankment strengthening works | 100,000 | 2012 |
| Kerry County Council | Ballyard | Works – Remove silt and accumulated stone from river & install additional drainage culvert. | 13,500 | 2009 |
| Kerry County Council | Dromartin Ballyduff | Construction of a reinforced concrete wall & associated works | 34,311 | 2020 |
| Kerry County Council | Incheree | Construct new embankment of approximately 360m & access road, pipe open drains and culvert Associated works | 8,237 | 2018 |
| Kerry County Council | Cullavaw River Rathmore | The removal of bushes, shrubbery & overhanging branches along the channel for 5.5 kms. Some removal of deposition from the channels | 40,000 | 2013 |
| Kerry County Council | Kenmare Town | Removal of beam / drain under Finnihy Bridge / Installation of gauges / Establish monitoring programme | 99,000 | 2012 |
| Kerry County Council | Ballylongford | Coastal flooding mitigation measures | 92,187 | 2015 |
| Kerry County Council | Ballyheigue-Banna-Carrahane & Brandon Bay Maharees (Tralee Bay) | Coastal Erosion & Flood Risk Management Study | 150,000 | 2018 |
| Kerry County Council | Feoghanagh | Clean silt and sand from rivers and estuaries | 5,400 | 2009 |
| Kerry County Council | N70 Valentia Road Caherciveen | • The provision of a proper coarse grating in the stream channel, 10m upstream of the intake point • Install a headwall at the intake point to reduce head losses • Install 10m long of 1050dia pipe to replace the existing rectangular section of culvert at the start of the run. • Install 1 no. new PCC manhole to allow the 1050dia pipe to connect to the existing 700dia pipe under the hotel car park. The provision of the manhole would reduce the severity of the existing bend at this location, thus reducing head losses and allowing increased flow through the pipe. Reinstatement of paved areas and the hotel boundary wall removed to enable works to be completed | 37,633 | 2024 |
| Kerry County Council | N70 Garranearagh Caherciveen | Feasibility Study | 5,258 | 2015 |
| Kerry County Council | Tullig Castleisland | Raising of retaining wall, culvert replacement at Tullig, storm water drainage pipe at Kilbannivane & associated works | 144,000 | 2014 |
| Kerry County Council | Emlaghslat Ventry | To clean silt and sand from rivers & estuary of rivers | 4,500 | 2011 |
| Kerry County Council | Fenit Road | Fenit Road Coastal Protection Scheme – Rock revetment & buttressing embankments | 405,000 | 2010 |
| Kerry County Council | Flesk River Glenflesk (Phase 1 & 2) | Clearance of vegetation of the river bank between Curreal Bridge at Glenflesk Village to Gortahoosh Bridge & Loo Bridge and associated works | 53,631 | 2019 |
| Kerry County Council | Milltown Village | Study | 2,700 | 2010 |
| Kerry County Council | Ballyheigue | Use of rock armour to stabilise the cliff, it will require a concrete toe anchored into rock | 307,910 | 2022 |
| Kerry County Council | N70 Valentia Road, Cahersiveen | Construction of a new grating system & relaying of approx. 100m of culvert & associated works. | 35,924 | 2021 |
| Kerry County Council | Cullavaw River Rathmore | Removal of instream gravel & silt build-up at various locations either side of the 3 no. road bridges along the Cullavaw River | 4,500 | 2015 |
| Kerry County Council | Dingle Bay East-Castlemaine Harbour | The procurement of additional survey work | 18,000 | 2020 |
| Kerry County Council | Lough Guitane Killarney | To construct a RC flood defence wall | 13,950 | 2012 |
| Kerry County Council | Emlagh West | To clear channel to increase hydraulic capacity | 6,300 | 2011 |
| Kerry County Council | Clieveragh Listowel | Site investigation, detailed design, preparation of tender documents & land acquisition | 148,370 | 2017 |
| Kerry County Council | Dingle Bay East- Castlemaine Harbour | Coastal Erosion & Flood Risk Management Study | 75,000 | 2018 |
| Kerry County Council | Ballyheigue | Use of rock armour to stabilise the cliff, it will require a concrete toe anchored into rock. A detailed topographic & bathymetric survey required. | 231,489 | 2020 |
| Kerry County Council | Castlemaine Harbour | The consultant shall undertake a site visit, detailed historical review and desk study of all available information relating to coastal erosion/accretion and flooding risk at Dingle Bay East-Castlemaine Harbour. This includes a review of topographic and hydrographic surveys, airborne and terrestrial LiDAR surveys | 2,622 | 2022 |
| Kerry County Council | North Kerry Way National Trail Seawall (coastal) | Repairs to an existing seawall between The Spa & Cockleshell Road, Tralee | 18,124 | 2018 |
| Kerry County Council | Ballyheigue | Use of rock armour to stabilise the cliff, it will require a concrete toe anchored into rock. | 191,730 | 2022 |
| Kerry County Council | Flesk River Glenflesk (phase 1 & 2) | Clearance of vegetation of the river bank between Curreal Bridge at Glenflesk Village to Gortahoosh Bridge & Loo Bridge and associated works | 152,986 | 2018 |
| Kerry County Council | Kenmare (Finnihy & Keelnagower Rivers) | Clearance of vegetation along 0.6km length of the Finnihy & Keelnagower River banks | 41,912 | 2021 |
| Kerry County Council | Incherea | The strengthening and raising of an existing embankment | 80,000 | 2012 |
| Kerry County Council | Kenmare Town | Flood Ass & hydrometric study of the River Finnihy. Removal of beam / drain under Finnihy Bridge / Installation of gauges / Establish monitoring programme.(not proceeding with the removal of beam/drain) | 13,500 | 2009 |
| Kerry County Council | Incheree | Construct new embankment of approximately 360m & access road, pipe open drains and culvert & associated works | 107,016 | 2017 |
| Kerry County Council | Waterville | Refurbishment and strengthening of a beach friendly rock revetment at the Promenade Waterville. | 35,492 | 2023 |
| Kerry County Council | Rossbeigh | Construction of a rock revetment | 450,000 | 2018 |
| Kerry County Council | Clieveragh Listowel | Study | 22,495 | 2016 |
| Kerry County Council | Ballylongford | Coastal flooding mitigation measures | 13,777 | 2015 |
| Kerry County Council | Dingle Bay East - Castlemaine Harbour | The procurement of additional survey work | 21,038 | 2021 |
| Kerry County Council | Kinard, Lispole | Stabilisation of the existing slope by soil nailing and shot creteing the cliff face. In addition, the surface water drainage networks in the vicinity of the proposed works to be altered | 56,796 | 2021 |
| Kerry County Council | The Spa Seawall North Kerry Way | Repair to a breach in the sea wall along the North Kerry Way National Trail | 24,170 | 2020 |
| Kerry County Council | Currow | Construct an upgraded reinforced flood defence embankment & associated works | 77,406 | 2017 |
| Kerry County Council | Tralee | The removal of debris, deposition & sediment under bridges and weir & associated works. Structural survey & inspection of bypass culverts. | 44,396 | 2015 |
| Kerry County Council | Goulane-Maherees | Clean silt and sand from rivers and estuaries | 9,000 | 2009 |
| Kerry County Council | Glenflesk | Study of recurring flooding in Glenflesk Village and N22 | 13,500 | 2009 |
| Kerry County Council | Caherleheen | Works – Widen culvert to Caherheen Bridge & incorporate river flow improvements. | 27,000 | 2009 |
| Kerry County Council | Cappaclough Camp | To clean silt and sand from drainage channels and river | 5,400 | 2011 |
| Kerry County Council | Flesk River Glenflesk (Phase 1 & 2) | Clearance of vegetation of the river bank between Curreal Bridge at Glenflesk Village to Gortahoosh Bridge & Loo Bridge and associated works | 27,000 | 2019 |
| Kerry County Council | Sneem | Flood Ass & hydrometric study of Sneem/Ardshellhane River | 18,000 | 2009 |