The Flood Risk Management County Summary Report contains information on the following areas;
Select a county to continue to view/download the information you require.
Historically, flood risk management focused on arterial drainage for the benefit of agricultural improvement. Arising from increasing flood risk, the Arterial Drainage Act, 1945, was amended in 1995 to permit the Office of Public Works (OPW) to implement localised flood relief schemes to provide flood protection for cities, towns and villages.
Some schemes have been carried out by the Local Authorities under their own powers using the Planning and Development legislative code. The OPW either works in association with the relevant Local Authorities or funds Local Authorities directly to undertake flood relief works.
Scheme | Properties Protected | Current Status |
---|---|---|
Carrick-on-Suir Flood Relief Scheme | 110 | Scheme Completed 2003 |
Clonmel (North & East) Flood Relief Scheme | 358 | Scheme Completed 2013 |
Mulkear River (Ballymackeogh) Flood Relief Scheme | 53 | Scheme Completed 1998 |
Clonmel (West) Flood Relief Scheme | 142 | Scheme Completed 2012 |
Marlfield Lake Flood Relief Scheme | 11 | Stage I: Scheme Development and Preliminary Design |
River Mall (Templemore) Flood Relief Scheme | 109 | Stage IV: Implementation/Construction |
Nenagh Flood Relief Scheme | 60 | Under Consideration |
Information on Local Authority led FRMP "Small Projects" (any project costing up to €1M or protecting 10 or more properties)
Scheme | Stage/Gateway | Properties Protected |
---|---|---|
Holycross Flood Relief Scheme | Commencement | 2 |
Golden Flood Relief Scheme | 5 | |
Knocklofty Flood Relief Scheme | Commencement | 5 |
The Minor Flood Mitigation Works & Coastal Protection Scheme (the “Minor Works Scheme”) was introduced by the Office of Public Works in 2009. The purpose of the scheme is to provide funding to Local Authorities to undertake minor flood mitigation works or studies to address localised flooding and coastal protection problems within their administrative areas. The scheme generally applies where a solution can be readily identified and achieved in a short time frame.
Under the scheme, applications are considered for projects that are estimated to cost not more than €750,000 in each instance. Funding of up to 90% of the cost is available from the OPW for approved projects. The commencement and progression of any works for which funding is approved is a matter for each Local Authority concerned.
Local Authority | Project Location | Project Details | Approved Funding (€) | Year of Approval |
---|---|---|---|---|
Tipperary County Council | Baynanagh Toomevara | Remove wall, lay piping, construct inspection chambers and roadside gullies. Provide fencing. | 42,210 | 2010 |
Tipperary County Council | Lagganstown | Road drainage system & outfall pipe through hill to natural lake | 18,000 | 2015 |
Tipperary County Council | Graigue Clogheen | To intercept storm water, works to include the laying of a 450mm diameter corripipe, backfilling & road reinstatement works | 13,950 | 2017 |
Tipperary County Council | Ardfinnan Clonmel | Works – Strengthening riverbank, raising embankment & removal of vegetation. | 15,636 | 2010 |
Tipperary County Council | Carrigeen Cahir | Improvements to Marshes Stream | 26,325 | 2010 |
Tipperary County Council | Holycross, Thurles | Construct a new surface water storm drain 315m long including manholes and chambers and civils works, outfall to existing open drain. | 77,400 | 2022 |
Tipperary County Council | St. Johnstown Fethard | Replacement of culvert | 4,500 | 2012 |
Tipperary County Council | Holy Cottage Road, Barnane, Templemore | Construction of 520m of a 450mm surface water pipe along with a number of new gullies & associated works. | 1,241 | 2021 |
Tipperary County Council | Tivoli Heights Clonmel | Works-Installation of new grill to improve flow, constructionof wing walls to side of culvert/pipe | 18,000 | 2009 |
Tipperary County Council | Kilroe, Ballylooby | Excavation of approx. 250 metres of a new 1.50m deep drainage ditch | 14,200 | 2012 |
Tipperary County Council | Buffanagh Killenaule | Maintenance of river between Buffanagh & Moglass | 13,250 | 2012 |
Tipperary County Council | Marlfield Lake Clonmel | Site Investigation, including culvert systems and design of repair and reconstruction works | 12,600 | 2010 |
Tipperary County Council | Toureen Cahir | Installation of 450mm pipe and 350m of additional land drains | 11,250 | 2010 |
Tipperary County Council | Currabaha | Construct inspection chambers, upgrade existing land drainage pipe. | 9,900 | 2010 |
Tipperary County Council | Blackcastle Road Templemore | To install a new 6m culvert beside the existing bridge, river widening & associated works. | 98,100 | 2021 |
Tipperary County Council | R-690-4 Lismalin | Install new drainage culvert beneath the R69-4 & excavate a new 130m long open drainage ditch on private lands | 10,800 | 2016 |
Tipperary County Council | Barna Newport | Provide 12” diameter piping at roadside for 250 metres to discharge to soak-pits | 27,180 | 2012 |
Tipperary County Council | Spa Villa Old Spa Road Clonmel | Form temporary dam & concrete bed, provide additional protection to wall, construct clay embankment & associated works | 5,400 | 2014 |
Tipperary County Council | Newcastle Clonmel | To replace sections of the existing masonry walls & replace with railing or other approved construction, to reduce risk of flooding of commercial premises using flood walls, gates etc. & fit non-return valves to existing pipe network | 21,600 | 2016 |
Tipperary County Council | Ballylooby | Construct reinforced earth embankment/Masonry wall along river bank within affected property. Install non - return valves on storm pipes draining to river. Install temporary Flood barriers at strategic locations to the affected property. | 25,200 | 2024 |
Tipperary County Council | Nenagh Swimming Pool & Adjacent Land | Clean drains/stream of silt/debris/vegetation Upgrade embankments | 13,500 | 2012 |
Tipperary County Council | Ballinahalla Clogheen | To install drainage gullies & lay approximately 800m of 300mm diameter storm water drainage pipe to outfall | 45,000 | 2016 |
Tipperary County Council | Greenan Templederry | Removal of existing boundary wall at the affected property including the sections collapsed. Excavation of silt deposits under bridge arch no. 1 to increase the headroom. Importation and compaction of 6-12" rock to restored river bed. Deposition/relocation of existing river bed material. Placing of Rock Armour and creation of earth retaining bund. Placing of Suitable fill material behind rock armour. | 31,613 | 2024 |
Tipperary County Council | Knockballiniry Goatenbridge | Excavation works, the laying of 450mm diameter corripipe, two road crossings & associated works | 32,625 | 2017 |
Tipperary County Council | Grange Village Clonmel | Survey and study | 6,300 | 2011 |
Tipperary County Council | Barravie | Construct gullies and lay piping, upgrade existing pipe, clean out existing land drain | 18,054 | 2010 |
Tipperary County Council | Red City Fethard | Upgrade culvert | 52,920 | 2010 |
Tipperary County Council | Grange Road Ballina | To provide 12 inch diameter SW piping and associated road gullies for a total distance of 400m | 47,610 | 2011 |
Tipperary County Council | Mullinahone | Removal of debris from the channel and banks prior to building a foundation and retaining wall along the banks A design and method statement to be developed | 225,000 | 2017 |
Tipperary County Council | Ardfinnan Clonmel | Works – Strengthening riverbank, raising embankment & removal of vegetation. | 162,684 | 2009 |
Tipperary County Council | Moangarriff Clonmel | Channel improvements | 30,600 | 2010 |
Tipperary County Council | Ardfinnan Clonmel | Works – Strengthening riverbank, raising embankment & removal of vegetation. | 44,550 | 2010 |
Tipperary County Council | Gortnahoola, Drombane, Thurles - Revised | Construct a new 750mm surface water storm line 155 metres along public road | 29,700 | 2023 |
Tipperary County Council | Marlfield Clonmel | Tipperary County Council propose to install temporary works to support the large retaining wall and parapet, if deemed necessary; Remove all vegetation and trees within the vicinity of the culvert. TTC propose to partly remove and strengthen the existing stone masonry and concrete retaining walls to the upstream embankments. | 45,000 | 2024 |
Tipperary County Council | Ardfinnan Clonmel | Installation of 40 linear metres by approx 3 metres height of rock armour to provide 1.2 metres height of protection to existing river bank | 15,480 | 2010 |
Tipperary County Council | Ardfinnan | Replace old Barriers with a modern reliable new system that is fit for purpose | 27,000 | 2024 |
Tipperary County Council | Cloughcarrigeen Estate Kilsheelin | To install new 240m long 300mm diameter surface water drainage pipe, connect existing open channel linear attenuation drain to new estate surface water drainage system & clean existing open drain | 63,000 | 2016 |
Tipperary County Council | Cascade Height Clonmel | Provide side support to the existing banks of Aulk Stream and reinforced concrete wall to front / Purchase concrete blocks and amend grille / Clean culvert under the road | 14,805 | 2010 |
Tipperary County Council | R504 at Longhouse Birdhill | Install 4no new gullies & lay 100m of 300mm diameter drainage pipes to an outfall | 13,500 | 2015 |
Tipperary County Council | Coolaholiga Nenagh | Channel maintenance, replace culvert. Restore parapet walls and wing walls | 24,000 | 2010 |
Tipperary County Council | Drish Thurles | Construction of a 450mm surface water pipe for a distance of 250m to an open drain along with a number of new road gullies & associated works. | 18,900 | 2019 |
Tipperary County Council | Clonsingle Newport | Construct new flood ramp, 2 new piers & barrier foundation. Purchase of flood barrier & fixtures | 13,500 | 2016 |
Tipperary County Council | River Suir Loughmore | Removal of obstructions & improvement of Water Conveyance in part of the River Channel which is not a Drainage District | 45,000 | 2015 |
Tipperary County Council | Ballinderry | Install new stone filter drain with perforated 225mm storm pipe & large gully | 47,700 | 2016 |
Tipperary County Council | Coopers lot, Cashel, Thurles, South Tipperary | Geomorphological analysis, Hydrological modelling and modelling assessment. | 22,500 | 2023 |
Tipperary County Council | Galbertstown Holycross | Construct a new surface water storm drain 400m long including manholes and chambers and civils works, outfall to existing open drain. | 76,500 | 2021 |
Tipperary County Council | Coopers lot, Cashel, Thurles, South Tipperary | Geomorphological analysis, Hydrological modelling and modelling assessment. | 45,000 | 2022 |
Tipperary County Council | Coopers lot, Cashel, Thurles, South Tipperary | Ground Investigation Surveys and SI | 107,100 | 2023 |
Tipperary County Council | Doon Araglin | Excavation of a new drainage ditch, cleaning an existing deep drainage ditch, installation of drainage pipes and electric fencing | 14,580 | 2011 |
Tipperary County Council | Clareen Cross Moyaliff Ballycahill | To construct approx. 600m of 300mm diameter pipe line and associated accommodation works | 33,408 | 2011 |
Tipperary County Council | Ballinderry, Nenagh | Install new stone filter drain with perforated 225mm storm pipe and long gully & discharge via 300mm storm pipe. Total length 455m | 72,292 | 2018 |
Tipperary County Council | Tivoli Heights Clonmel | Works-Installation of new grill to improve flow, constructionof wing walls to side of culvert/pipe | 1,373 | 2010 |
Tipperary County Council | Railstown Cashel | Widen Moyle Stream, repair bridges & culverts | 45,360 | 2010 |
Tipperary County Council | Capparoe, Nenagh | Supply & lay 80m of 300mm/120mm/300 diameter/120mm 450mm diameter pipeline Associated works | 43,042 | 2020 |
Tipperary County Council | Nenagh Road Borrisoleigh | Construction of 120m of a 450mm surface water pipe along with 3 new gullies & associated works | 27,000 | 2019 |
Tipperary County Council | Mullinahone | Removal of debris from the channel and banks prior to building a foundation and retaining wall along the banks A design & method statement to be developed | 119,700 | 2020 |
Tipperary County Council | R-691- 4 Ballinure School | Clear out 500m of open drain on agricultural land & dispose of material | 13,500 | 2016 |
Tipperary County Council | Ardfinnan Clonmel | The provision of a pumping installation in the 'Back River' to discharge to River Suir over flood defences during flood times | 15,750 | 2011 |
Tipperary County Council | Gortnahoe | Construct a new surface water storm drain 200 metres long including manholes and chambers and civils works, outfall to existing open channel. | 22,500 | 2023 |
Tipperary County Council | Greenhills/Kilmastulla Ballina | Upgrade of the existing road surface water drainage system & associated works | 56,700 | 2018 |
Tipperary County Council | Convent Road Cahir | Cleaning & deepening of existing drain / Excavation of trench / Laying of pipe bedding and 40m of concrete pipe / Construct manhole and backfill/compact / Restoration works | 31,500 | 2010 |
Tipperary County Council | Rathkennan | Overflow pipe from lane way adjacent to houses to mitigate against flooding | 4,500 | 2015 |
Tipperary County Council | Dualla Road and Waller’s Lot Cashel Town (Revised) | Study | 4,389 | 2018 |
Tipperary County Council | The Millrace Cahir | Clean & dredge the Milrace from the River Suir to the downstream weir, remove silt & vegetation | 35,550 | 2017 |
Tipperary County Council | Dualla Road and Waller’s Lot Cashel Town | Study | 22,611 | 2017 |
Tipperary County Council | Curragh Goatenbridge | Cleaning of approx 200 metres of existing 1.50m deep drainage ditch /Installation of approx. 60 metres of 375mm concrete drainage pipe & drainage grates | 7,650 | 2012 |
Tipperary County Council | Grange Cremary | Install 900mm pipes to upgrade bridge capacity | 9,000 | 2012 |
Tipperary County Council | Blackcastle Rd, Templemore, Co. Tipperary | Tipperary County Council propose to construct an additional 6m culvert beside an existing bridge. TCC then intend on raising the road as well as widening an existing channel. | 181,000 | 2024 |
Tipperary County Council | Holy Cottage Road, Barnane, Templemore | Construction of 520m of a 450mm surface water pipe along with a number of new gullies & associated works | 13,500 | 2019 |
The OPW has statutory responsibility for and carries out a programme of Arterial Drainage Maintenance. These maintenance works relate to arterial drainage schemes completed by the OPW under the Arterial Drainage Acts 1945, with the primary purpose to improve the drainage of agricultural lands. Local Authorities are responsible for the maintenance of Drainage Districts, which were completed up to 1943.
The OPW’s annual Arterial Drainage Maintenance Works Programme protects 260,000 hectares (650,000 acres) of agricultural lands and comprises 11,500km (7,150 miles) of river channel and approximately 800km (500 miles) of embankments.
Completed Scheme | Scheme Type | County(s) | Duration of Works | Benefitting Area (Acres) |
---|---|---|---|---|
Carrigahorig | Small Arterial Drainage Scheme | Offaly, Tipperary | 1968-1971 | 3,800 |
Maigue | Major Arterial Drainage Scheme | Cork, Limerick, Tipperary | 1973-1986 | 30,500 |
Nenagh | Minor Arterial Drainage Scheme | Offaly, Tipperary | 1955-1960 | 6,500 |
The following table sets out the communities in this county that are covered by the Flood Risk Management Plans launched in May 2018 and provides an indication of the proposed flood relief schemes contained in the Plans for these communities. It should be noted that this table provides the position from May 2018 and the status of some schemes may have changed since then. Any changes will be reflected elsewhere in the county summary. In some instances, a technically viable flood relief scheme has been identified, however, a more detailed assessment of the costs and benefits will be completed to determine if the proposed Scheme is feasible. For other communities, there is a relatively low level of flood risk from rivers and/or the sea, and no structural flood relief measures are therefore proposed at this time. The current level of risk will be reviewed, along with all areas, on a regular basis into the future. In addition to the implementation of proposed flood relief schemes, funding will continue to be available for localised projects under the Minor Works Scheme. The Plans also set out those non-structural measures in place or proposed, for example Flood Forecasting, which benefit all at risk communities and properties. The Interdepartmental Flood Policy Co-ordination Group will continue its work now greatly informed by the wealth of knowledge in the Plans to bring forward further feasible proposals for Government’s consideration to support and assist households and communities through non-structural flood risk management and mitigation measures.
Area Name | Existing Scheme in Place | Scheme in Construction, Design or Pending | New Scheme Proposed in the Plans | Potential Scheme subject to further assessment | No Scheme Proposed as Community at Low Risk or Scheme Not Viable |
---|---|---|---|---|---|
Ardfinnan | |||||
Ballyporeen | |||||
Bansha | |||||
Borrisokane | |||||
Borrisoleigh | |||||
Cahir | |||||
Carrick on Suir | |||||
Clogheen | |||||
Clonmel | |||||
Fethard | |||||
Golden | |||||
Holycross | |||||
Kilsheelan | |||||
Knocklofty | |||||
Marlfield | |||||
Mullinahone | |||||
Nenagh | |||||
Newcastle | |||||
Newport | |||||
Roscrea | |||||
Templemore | |||||
Thurles | |||||
Tipperary Town |