Flood Risk Management Plan |
Section 1 |
Provides an introduction and background to the Plan, including the flood risk management objectives the Plan is aiming to achieve, and sets out the scope of the Plan
|
Section 2 |
Provides an overview of the catchment and coastal areas covered by the Plan, including a summary of the flood history and existing flood risk management measures
|
Section 3 |
Describes the Preliminary Flood Risk Assessment (PFRA) undertaken to identify the Areas for Further Assessment (AFAs) that are the focus of the Plan
|
Section 4 |
Outlines the public and stakeholder consultation and engagement undertaken throughout the National CFRAM Programme and other relevant projects
|
Section 5 |
Details the existing and potential future flood hazard and risk in areas covered by the Plan
|
Section 6 |
Describes the environmental assessments undertaken to ensure that the Plan complies with relevant environmental legislation and inform the process of identifying the suitable strategies that will, where possible, enhance the environment
|
Section 7 |
Sets out the measures to manage the flood risk in the area covered by the Plan, and how these were developed and assessed, and provides a summary of the measures proposed in the Plan
|
Section 8 |
Outlines how the implementation of the Plan will be monitored and reports, and then reviewed and updated at regular intervals
|
APPENDIX A |
Provides an overview of flooding and flood risk
|
APPENDIX B |
Describes in more detail a physical overview of the River Basin
|
APPENDIX C |
Summarises the process in undertaking the Preliminary Flood Risk Assessment
|
APPENDIX D |
Provides details on certain aspects of the public and stakeholder consultation and engagement
|
APPENDIX E |
Sets out the flood risk in each AFA
|
APPENDIX F |
Provides a summary of the different methods of flood risk management
|
APPENDIX G |
Describes the potential flood risk management works
|