Environmental Assessment

 

The overall objective of the environmental assessment is to identify the environmental receptors within the scheme area to establish the interactions between the environmental receptors to ensure that they are understood and assessed in terms of significant environmental impacts.

 

The first step in the environmental assessment process is the identification of environmental constraints. The Constraints Study will be primarily delivered via desk-top review and supplemented by targeted field assessments by various experts. The Study will identify environmental constraints that might be relevant to, or impose restrictions on, the design and construction of the proposed flood relief scheme. The Constraints Study will be informed through consultation with statutory and non-statutory bodies, collation of background information, relevant national datasets & mapping, public information days (including feedback) and relevant information from the Engineering team & the Steering Group. Previously commissioned reports and surveys for the flood relief area will be reviewed and their findings incorporated into the constraints process. Consultation will seek to request comment, observations and relevant information regarding the scheme and likely sensitive receptors.

The findings of the constraints process will be presented in a Constraints Study Report and will include an assessment of the constraints on receptors such as:

  • population and human health,
  • biodiversity including ecological designations,
  • protected habitats and species,
  • watercourses and waterbodies (hydrological connectivity to the wider environment),
  • cultural heritage including features of archaeological and architectural interest,
  • landscape character areas etc.

The output of this study will be to inform the design process for the scheme from an environmental viewpoint.

Following identification of options for the scheme, the team will conduct an environmental assessment of the viable options. This will be an iterative process with the engineering team and the steering group to identify an option that delivers the objectives of the scheme whilst seeking to avoid or minimise impacts on the environment. The team will establish the likely environmental impacts and also identify feasible avoidance or mitigation measures and environmental enhancement measures for each option.

The preferred option will then be subject to Environmental Impact Assessment and Appropriate Assessment screening in accordance with the EIA Directive 2011/92/EU (as amended by EIA Directive 2014/52/EU) and Habitats Directive 92/43/EEC as transposed into Irish legislation under the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 and Planning and Development Act 2000, as amended. The outcome of these screening assessments will determine whether an Environmental Impact Assessment Report and Natura Impact Statement are required for the scheme.

 
Documents will be uploaded here when available

 

 

 

 

 


 

Postal address: Ayesa, Building 2100, Cork Airport Business Park, Kinsale Road, Cork. T12 KV8R

Telephone: +353 (0)21 240 7988

Email: CavanTownFRS@Ayesa.com

 

 

 

Copyright 2022, All rights reserved

Privacy Statement

Steering Group Members

 

 

 

 

OPW's National Flood Information Portal - www.Floodinfo.ie